V2 · Entities & Setup

From a blank organization to fully-operational standing data — profile, sites, pools, meters, tariffs, and interval data flowing.

You are here
1Setup
→
2Strategy
→
3Deal
→
4Nominate
→
5Market day
→
6Settle
→
7Statement

1. Signing in — the five front doors, in practice

V0 §2 introduced the apps and seats; this chapter is the practical door-by-door walkthrough.

The landing page at / is a centered card titled “Webill Green” — “Choose your application to sign in.” — with five dark choice cards:

Card Subtitle What clicking does
Organization IPP / Trader / Off-taker opens the organization picker
Eskom National utility resolves eskom@webill.net immediately
Utility Local distributor opens the municipality search
Market Operator SAWEM MO resolves mo@webill.net
System Operator SAWEM SO resolves so@webill.net

Whichever door you choose, the final step is the same small form: the resolved Email (read-only) and your Password, posted as a real form submission so the session cookie is set. On success you land on the app’s home: /org/configuration, /eskom/virtual-contracts, /munix/configuration, /mo or /so. A Back arrow returns to the cards; Switch application in any app header brings you back here later.

Follow along. Seat: Off-taker C (offtaker_c@webill.net, password supersecret — demo environments only). Path: / → Organization → choose OffTaker C → Log in. You should see: the Configuration screen under the “OffTaker C” organization banner.

Careful. Your session carries exactly one context (an organization, a municipality, or an operator seat). Every screen re-checks it — opening another organization’s URL by hand redirects you out with a flash, not into their data.

2. Your organization — profile and accreditations

Before you trade a single kilowatt-hour, the platform and your counterparties need two answers: who you are, and which paperwork you hold. This screen is where you give them. Open Organization, the first item in the sidebar (/org/configuration). Its three tabs split the job:

Tab Address What you keep there
Organization /org/configuration your profile and your carbon participation
Accreditations /org/configuration/accreditations the Eskom and municipal paperwork that lets you trade
Feeds & webhooks /org/configuration/feeds the data coming in and the notices your systems receive

Every tab carries a tooltip naming its purpose; it opens on hover and when you move to the tab with the keyboard. Manual, at the top right, opens the section of this chapter for the tab you are on.

Unsaved work is marked. A form’s Save button stays grey until you change something. Then an amber Unsaved changes chip appears beside it. Switching tabs keeps what you typed. Leaving the screen with unsaved changes asks first.

Errors sit on the field. When a save is refused, the field that needs fixing turns rose, with a sentence under it saying what to enter. The cursor moves there, and a toast at the top right confirms nothing was saved. It stays until you close it.

2.1 Profile

Three facts come first and cannot be edited here: Legal name, Status (Active or Inactive) and Organization type (for example Close corporation (CC)). They are set when the organization is registered. Below them is the form:

Field Notes
Trading name the “trading as” name shown on the banner and to counterparties
B-BBEE level your B-BBEE level: Level 1 through Level 8, or Non-compliant. Not recorded clears it.
Website your public address, starting with https:// (for example https://www.example.co.za)

Each field’s ⓘ icon explains it. An incomplete address such as apex is refused at the field. Save writes immediately (“Organization profile saved.”).

2.2 Eskom trader accreditation

To trade wheeled energy on Eskom’s network you need your Eskom paperwork signed: the Trader Participation Agreement (TPA) and the Balancing & Settlement Agreement (BSA). The card tracks each as a checkbox plus its date:

A date belongs to its agreement. It stays disabled until you tick the agreement, then it becomes required. Once saved, a date shows as text with a pencil; press the pencil to change it, or ✕ to cancel the change.

If you untick an agreement that already has a date, the date is struck through with “will be removed when you save.” Keep this date ticks the box again. Save goes ahead only when you mean it, and the confirmation names what was removed (“… The TPA date was removed.”).

The chip beside the heading reads Complete when the accreditation is complete: both agreements ticked and both dated. Otherwise it reads Incomplete, and a line beside it names what is missing (TPA not signed · BSA date missing).

2.3 Municipal accreditations

Each wheeling-enabled municipality you want to trade in needs its own row: the municipal version of the Eskom paperwork. + (Add municipal accreditation) opens an inline row. The municipality list offers only municipalities whose wheeling status is WHEELING and that you have not already added. When none is left, + is disabled and its tooltip says No wheeling municipality left to add. Per row:

Column Meaning
Municipality who this accreditation is with. Select the heading to sort A→Z or Z→A. The order is kept in the address (?sort=desc).
Status Complete or Incomplete, as on the Eskom card
On trader register has the municipality added you to its trader register?
Registration date when
Agreement signed is the municipal wheeling agreement signed?
Agreement date when

A row is Complete only when both boxes are ticked and both dates are present. As on the Eskom card, a date stays disabled until its box is ticked, and unticking a box clears its date.

2.4 Why this gates everything else

Accreditation is not decoration: the Trader Pools directory refuses to create pools for an unaccredited organization — “The Organization has not been accredited to trade either by Eskom or by any municipality which supports wheeling.” — and counterparties see your readiness when your sites appear in their market search. The gate uses the same rule as the chips: an agreement counts only when it is ticked and dated. Complete this screen before building the rest.

Follow along. Seat: Trader 1 (trader_1@webill.net). Path: Organization → Accreditations. You should see: a Complete Eskom accreditation, and municipal accreditations for City of Johannesburg and City of Cape Town — Trader 1 is one of the fully-accredited demo seats.

Data. full_demo · seed 42 · stages S01/S03 (foundation & parties) · sealed 2026-07-15.

An organisation can act as an IPP, trader, off-taker, network operator or BRP service provider, including several roles at once. These roles are separate from org_type, which records legal form. An empty explicit role list falls back to owned generator sites, off-taker sites and trader pools, plus registrations balancing another organisation’s book.

2.5 Carbon participation

Carbon trading and the carbon-tax pack are optional. An organization joins them by applying to become a carbon participant, and an operator approves the application before the carbon rooms open. The Carbon participation card on the Organization tab is where you apply.

flowchart LR
  A[Apply to participate] --> B[Confirm: Send application]
  B --> C[Pending approval]
  C -->|you withdraw| A
  C -->|operator activates| D[Active]
  C -->|operator refuses| E[Refused]
  1. Press Apply to participate. A panel explains what happens next; nothing is sent yet. Cancel closes it.
  2. Press Send application. The chip reads Pending approval (“Carbon participant registration submitted for operator review.”).
  3. While it is pending you can press Withdraw application, then Withdraw application again to confirm (Keep it backs out). Nothing has been activated, so you can apply again later.
  4. When an operator activates it, the chip reads Active and the carbon rooms appear in the sidebar. Once an operator decides, the application can no longer be withdrawn.

Where this is taught. The operator’s side, Activate and Refuse, is V11 §12. The tax year the profile unlocks is V20.

2.6 Feeds and webhooks

The Feeds & webhooks tab answers two questions: is our data arriving? and which of our systems hear about events here? Data feeds lists each meter and weather feed by name, with its key, a status chip (Receiving, Stale, No data yet, Refused, Upload on demand or Simulated) and its interval. Webhooks lets you register an HTTPS address for your own systems, choose its topics, and pause, rotate, delete or restore it later. Recent deliveries shows what was sent.

Where this is taught. Feeds, webhooks, topics, signing secrets and dead letters are taught in V21 §11, including how to create a webhook.

3. Off-taker sites — the buy side

An off-taker site is a place that consumes energy and wants to buy it wheeled. Its record answers four buyer questions the rest of the platform keeps asking: where and how is it connected (network, voltage, municipality), how much does it use (the demand estimates and its meter), and what does it want commercially (tariff preference, spill treatment, contract horizon), and what must be carried into a proposal (wheeling deposit position and the preferred remedy if supply falls short).

Where this is taught. The directory table, each column, and Portfolio summary & coverage notes: V5 §2.1. Who Needs attention keeps, and where Next step sends you: V5 §2.1.5. Creating a site on the OffTaker seat (every section, field, and refusal): V5 §2.3. Demand classes, spill as an object, and Edit: this chapter.

3.1 The directory

OffTaker Sites (/org/off-taker-sites) is a table of registered consumption sites. Search, status, network, and sort sit above it. Portfolio summary & coverage notes is folded underneath.

Where this is taught. Every column header, the optional price and PPA columns, Needs attention, and the four summary tiles: V5 §2.1.

Site details (#offtaker-workspace-details) opens the record drawer (#offtaker-site-details-drawer) from a site you have already opened. The drawer carries that site’s plumbing, including the Trading Unit and network zone when they exist, the short verdict, and Edit & complete site record. Close it with the X, Escape, or the dimmed backdrop. The directory table has no BRP column. A missing zone or Trading Unit is a warning under the site name, taught in V5 §2.1.5.

3.2 Creating a site — the wizard, step by step

Add New Site (#open-off-taker-site-wizard) creates a draft and opens /org/off-taker-sites/onboarding/<id> — a seven-section workspace, not the older six-step modal.

Where this is taught. The OffTaker-seat walk — every word, click path, section, field, refusal, draft rail, and what “done” looks like: V5 §2.3.

This chapter keeps the entity rules that workspace writes and that Edit still lets you change.

On create, Facility category plus Network service provider become the site’s Strategy Demand Classes — the tags that decide which trader-book demand pools may pick the site up. You do not tick those classes on the create workspace. The write-down is:

Facility category Classes written
Manufacturing · Mining · Cold storage Industrial
Office · Retail · Hospital · Mixed use · Residential · Other Commercial
Any category and Municipality connection the row above, plus Municipal

Trader Sales is not applied on create.

On Edit, a category change adds the recommended class(es) without wiping extras you already selected. There is no separate checkbox row on the onboarding workspace.

Strategy Demand Classes — how category and connection recommend, then Edit can multi-select (illustrative · OffTaker C Midrand DC pattern)
1category
Primary categoryCold Storage
recommends→
Demand classIndustrial
2connection
Connection typeMunicipality
also adds→
Demand classMunicipal
3result
Site eligible forIndustrial + Municipal
intersects→
Trader pool Demand rolesmembership only if overlap

Note. A trader pool only accepts the site when at least one of these classes intersects the pool’s Demand roles (§5.3). Selecting both Industrial and Municipal widens which municipal and industrial books can pick you up.

Spill treatment on the site is an opening preference, not a signed rule. The same leftover energy can be written off, credited cheap, or banked:

Spill treatment — same 80 kWh leftover, three commercial outcomes (illustrative · one settlement interval)
AZero Value
Matched420 kWh
+
Spill80 kWh → R 0
BDiscounted
Matched @ PPA420 kWh
+
Spill @ discount80 kWh credited low
CBanking
Matched420 kWh
+
Spill banked80 kWh → future draw

Where this is taught. How settlement applies spill, banking and shortfall on a matched interval: V8 §2 · V8 §7. The create workspace fields: V5 §2.3.

3.3 Editing, and what locks

Edit (#off-taker-site-edit-<id> in the detail drawer) opens the same onboarding workspace used to create a site, /org/off-taker-sites/onboarding/<id>, prefilled from the live shop. The page shows an Editing chip (#off-taker-onboarding-edit-badge) and Save changes instead of Create off-taker site. Save writes that site. It does not open a modal and it does not create a second shop.

Think of it as taking the shop’s existing card back to the desk to correct a stamp — not starting a new card.

Two facts stay locked after registration:

Locked What you see
Network service provider Eskom / Municipality shown as selected but not changeable
Physical address & location map still shows the pin and municipality panel; address search and site-pin click/drag are disabled. You can still move the meter-point.

Everything else remains editable across the same sections — site name and public flag, Eskom / VWA paperwork, voltage, meters and tariff, business category (which may add recommended Strategy Demand Classes without wiping extras), consumption estimates, preferences (including deposit status and shortfall remedy), and RECs.

Save & exit returns to /org/off-taker-sites with the site still there. An edit session does not appear on the amber Off-taker site drafts rail — that rail is only for unfinished new shops.

Where this is taught. The create walk (sections, fields, refusals): V5 §2.3.

3.4 BRP — Trading Unit and zone

Each site row carries a BRP column. The cell is blank until the organisation is an ACTIVE Market BRP with a BRP reference — a filed application that is still pending does not unlock it.

Once that seat is active: if the site is registered as a demand-side Trading Unit, the cell shows the TUID above the network zone (same colour swatch as the SO/MO zone register). Click either to open /org/trading-units.

If the site is not in a published network zone, the cell says No Market Zone instead of offering registration.

If there is no TUID and the site is allocated, Add Trading Unit opens a modal wizard — header BRP Standing Data OffTaker Registration, steps Identity · Zone · Delivery · Demand · Finance — that files §7.2 standing data and creates the demand-side unit.

Where this is taught. Every tab, every input, and the Market Operator inspection boards: V9 §3.9B.

Where a registered site’s location is not covered by the map, the zone line says Unassigned and names the nearest zone. A notice above the table explains what that blocks. The nearest zone is deliberately not used as an assignment: putting the site there would place it in the wrong balancing group.

Nothing about the site itself changes, and nothing about today’s trading is affected until the unit is registered. The full zone treatment is V12 §2.

3.5 What the market registry adds to a site

A site’s zone decides which market registration it can belong to. Its meter decides something else: who the market thinks is on the other side of the energy.

Every metering point registered in the market carries a counterparty — the party buying what you sell or selling what you buy through that meter. The platform derives it from your signed PPAs, so for a site with contracts in place there is usually nothing to enter. Two situations do reach you:

Both live at BRP / Market → Market registry, taught in V9 §3.

3.6 What your consumption is worth, and to whom

This screen records how much the site uses. The wholesale market asks a second question: what each slice of that consumption is worth to you.

A consumer in the market can publish a ladder — this much I will drop readily, this much only at a real cost, this much only at severe cost, and this much I cannot drop at all. The market curtails from the cheapest rung down, so a site that publishes a genuine ladder gets paid when the market wants its flexibility.

Declaring the whole consumption must-serve is a real choice, and usually the right one. For most industrial loads there is no flexibility to publish, and the platform makes that one setting rather than a form to fill in. Being wrong in that direction only forgoes revenue. Being wrong the other way — publishing flexibility the site does not have — means being shed and unable to comply.

Two fields on this screen feed it: curtailment acceptance is the nearest existing signal of whether a ladder is even possible, and the site’s current tariff is the defensible starting point for what the rungs are worth. Neither is the answer: what a process is actually worth is a commercial conversation with the site, and the platform records which question was answered so a curtailment can be argued afterwards. Taught in V9 §3.

Careful. Connection type and physical location cannot change after registration — network matching and commercial scope were fixed against them.

Follow along. Seat: Off-taker C (offtaker_c@webill.net). Path: OffTaker Sites. You should see two sites: OffTaker C Midrand DC (Cold Storage, Municipality/Johannesburg, 22kV, private, active) and George Eskom Plant (Manufacturing, Eskom, 22kV, public — with the full ESA/VWA registration story). Contracted counts are non-zero: this seat carries the rich settlement story.

Data. full_demo · seed 42 · stage S03 (parties) · sealed 2026-07-15.

4. Generator sites — the sell side

A generator site is an IPP’s plant. Its record carries everything a buyer, a network operator and the settlement engine will later rely on: the technology and its capacities, the grid connection and its paperwork, the transformer, the expected yield and its TOU shape, and the revenue meter.

Organisation ownership also drives the site’s effective-dated fleet membership. The membership begins no earlier than commercial operation and closes on an exclusive departure date; closing it preserves the site’s own record and strategy history. See V4 §2.

4.1 The directory

IPP Sites in the sidebar — its label reads IPP Sites (n), where n is every generator site the organisation holds, whatever its status (Active, Open, Inactive or Closed) — opens the room on the Fleet tab (/org/ipp-sites), the four-chapter portfolio story taught in V4 §2. Switch to Sites (/org/ipp-sites/sites) for the register — the tab tooltip reads The register of generator sites — which site needs you, and where to go. The tab label carries the same count as the sidebar, for example Sites (7); OffTaker Sites (n) and Trader Pools (n) count every site or pool in the same way. The browser tab reads Sites · IPP Sites · Webill Green.

The header is the same on both tabs: the heading IPP Sites, one line (here Your generation sites, their status, and the next step.), and on the right Import intervals (#open-interval-import, a modal — §7.7) and the round + (#open-ipp-site-wizard). Its tooltip, Add New Site, opens below the button, so it never covers Import intervals. The + opens a blank onboarding form; no draft exists until you save a first answer (§4.3).

Drafts. Unfinished registrations sit above the register under IPP site drafts, one card each: the draft’s name and N of 6 core sections, then its project stage when one is set — for example 2 of 6 core sections · Grid application. Click a card to resume at /org/ipp-sites/onboarding/{id}. The old address /org/ipp-sites/drafts opens this same register, and a site’s quick view opens there just as it does here.

Search, attention and filters. One row of controls sits above the table:

Control What it does
Search sites… (#ipp-sites-search) Matches a site’s name, technology and address. When only the address matches, the row adds a line Matched address: {address} so the hit is not a mystery. Pressing Enter does not reload the page
Needs attention n (#ipp-sites-attention) Shows only flagged sites; press again (×) to show all. While the register is still loading, the count is a pulsing placeholder, never a false 0
Filters & columns (#ipp-sites-filter-toggle) Opens Status (#ipp-sites-status-filter: All statuses · Active · Open · Inactive · Closed), Technology, Sort (Attention first · Name A–Z · Name Z–A) and the checkbox Show price, revenue & PPAs
Clear filters (#ipp-sites-clear-filters) Appears with Filtered view once any filter is on. It resets every filter and empties the search box, so the old text does not come back on the next filter change

A site needs attention when it has an export-limit (MEC) finding, a missing Trading Unit registration, a market-zone problem, or more than half of its energy unsold. A site that simply has no buyer yet is not flagged: its Next step is Set up sales. The fold How to read this, under the table, says the same, and adds that a search also matches a site’s address.

The register table (#ipp-sites-table). One row per site:

Column What it shows
Site / capacity The site name (press it for the quick view), then the technology in words — Solar PV, Wind, Battery storage (never BESS) — with the capacities, place and contract count, for example 0.5 MWp / 0.5 MWac (a fractional capacity keeps its decimal). Amber warnings follow when they apply: MEC breach, Trading Unit registration missing, No Market Zone
Status Active, Open, Inactive or Closed, with a green dot while Active (§4.8)
Sold · forecast The share of the site’s energy sold in its latest forecast, or a dash when it has none
Realised · c/kWh · Revenue · P50 · PPAs · Virtual PPAs Only with Show price, revenue & PPAs on. PPAs and Virtual PPAs count signed and active agreements and link to them in Deals
Next step One link to the screen that fixes the row: Review export limit, Review unsold energy, Review registration, Set up sales, Run forecast or Review performance

The table scrolls with the page, so every row is reachable, and its header row sticks flush to the top of the page as you scroll. With Show price, revenue & PPAs on, the wider table keeps its own scroll box (up to 70 % of the window’s height) so it can also scroll sideways; the header then sticks to the top of that box. Under the table: N of M sites, How to read this, and Portfolio summary & coverage notes — the same strip as the Fleet tab’s Registered sites · sales snapshot (V4 §2.1).

The quick view (#fleet-detail-drawer). Pressing a site name opens a right-hand drawer with the branded header — eyebrow Generator site · quick view, the site name, a status and a technology chip, and X. Inside: the subtitle, a one-line verdict written from the numbers, the forecast snapshot date and the site’s vitals. The verdict counts contracts, not buyers, because one buyer can hold several — Sells 4 % of its energy under 4 contracts at 85 c; the rest spills at the spill value. …, or with no contract at zero. Also needs attention lists the row’s warnings with Review details →, and the fold What these figures mean explains the vitals. The footer holds the row’s next step and Open site workspace. Escape, the backdrop, or X closes it.

The site workspace (/org/ipp-sites/sites/{id}/{tab}) is where one plant’s work happens — Operations, Performance, Allocation, Commercial and Dashboard, mapped to their chapters in V4 §3. Site details, top right, opens the site’s market plumbing — the MEC breach and No BRP badges when they apply and the BRP cell (§4.4) — then the complete site record with Edit complete site record (§4.3), and the fold Site lifecycle & fleet membership: Activate / Deactivate (§4.8) and Record departure (V4 §2). The fold stays open after you press one of its buttons.

4.2 Creating a site — the wizard, step by step

Careful. Add New Site (the round + on IPP Sites) no longer opens the six-step wizard below. It opens a blank generator-site onboarding form at /org/ipp-sites/onboarding/new, and nothing is saved until you enter the first answer (§4.3). The step tables in this section are kept as a field reference for the plant facts the platform asks for; on screen they sit in the onboarding form’s sections, and Create open site record on its readiness gate takes the place of Register IPP.

Think of the steps as answering six plain questions buyers and the network will ask later: where is the plant and on which network, which meter proves the export, what kind of plant and how big, how does it step up to the grid, how much energy does it typically make and when, what paperwork proves it may inject, and how it intends to handle excess energy, RECs, and the wheeling forecast in a proposal.

Step 1 · Site Details — Location, network & plant life.

Field Notes
Site Name * human label for the plant (e.g. Tshwane Solar Park)
Connection Type * card pick — who owns the wires you inject into:
  • Eskom — national Transmission / Distribution network; always available. Required when the map pin is outside any municipality
  • Municipality (MUNIX) — local municipal distributor; only offered when the map pin falls inside a municipality boundary. That municipality’s wheeling status must be active for registration
Physical Address & Location * type-ahead address search plus a click-to-place map pin; the pin resolves province, municipality and its wheeling status automatically. The side panel also shows GPS and, for Eskom, whether the chosen generator voltage looks like Transmission or Distribution
COD * commercial operation date — the day the plant is (or will be) commercially online
Lifetime (years) * how many years the plant is expected to run; the wizard shows the computed end-of-life date (= COD + lifetime)
Generator Connection Voltage optional — voltage at the grid injection point; informs the Eskom Transmission vs Distribution hint. Options:
  • 400V (LV) — low voltage; typically behind a step-up transformer on small plant
  • 11kV · 22kV · 33kV (MV) — medium voltage distribution injection
  • 44kV · 66kV · 88kV · 132kV · 220kV · 275kV · 400kV · 765kV (HV) — high / extra-high voltage; higher tiers read as Transmission on Eskom
  • VHV — very high voltage when none of the listed HV tiers apply
Publicly listed site toggle (default on):
  • On — plant can appear in counterparties’ market search
  • Off — plant stays private to your organisation

Careful. If the map pin lands outside any municipality, the wizard forces Connection Type to Eskom — there is no municipal network to connect to. The eligibility banner then tells you whether wheeling can work at this location (municipal sites need a municipality whose wheeling status is active).

Step 2 · Meter Details — Who measures the export. Typing a new number is registration: on Register IPP the wizard creates each device (or links an existing one you searched) and attaches the primary meter to the site.

Field Notes
Primary meter number * the revenue meter identifier (e.g. MTR-NERSA-GEN-…). Type ≥ 5 characters and Search to pick an existing org meter, or leave a new number and choose manufacturer/model so the wizard creates it
Meter manufacturer · model optional — from the manufacturers registry; model list narrows after manufacturer
Check meter number optional check meter — an independent second meter for verification; leave blank if you have none
Check meter manufacturer · model same pattern as the primary; only needed when a check-meter number is entered
CT ratio · VT ratio current- and voltage-transformer scaling for the metering installation (defaults 1.0). Must match the installation record filed with the network operator; NRS 057 expects class 0.2S / 0.5S revenue instruments

Note. Check meters are recommended by NERSA for wheeling above about 1 MW. The site’s consumption explorer and settlement still read the primary meter; the check meter is the independent second witness.

Step 3 · Connection — What kind of plant, which trader pools it may join, and how big it is.

Field Notes
Technology Type * card pick — choosing one applies sensible capacity defaults and recommends Strategy Supply Class(es) without wiping extras you already selected:
  • Solar PV — photovoltaic plant; daytime generation shape. Recommends Solar
  • Wind — wind turbines; output follows wind resource. Recommends Wind
  • Hydro — run-of-river or storage generation; the optional profile distinguishes them.
  • Coal — thermal generation; capture fuel and heat rate for economics.
  • Gas — gas-fired thermal generation, with its cycle and fuel source.
  • Diesel — peaking generation; starting costs and fuel prices matter.
  • Biomass — thermal generation with a biomass fuel basis.
  • Pumped storage — hydro that can also pump; capture pumping capacity and cycle efficiency.
  • Battery (BESS) — storage that can charge and discharge on a schedule. Recommends Firm and Flexible
  • Hybrid — co-located mix (e.g. solar + BESS) with controllable delivery. Recommends Firm and Flexible
Strategy Supply Classes select all that apply — checkbox cards; a plant can join more than one trader-book supply pool:
  • Solar — daylight PV energy into Solar supply pools; typically fills Commercial / Municipal demand after firm queues. Recommended for Solar PV
  • Wind — variable wind-shaped energy into Wind supply pools. Recommended for Wind
  • Firm — guaranteed / nominated capacity for firm offtake (Trader Sales and similar). The engine prefers this stack before open solar/wind. Recommended for Hydro, BESS and Hybrid
  • Flexible — dispatchable or shapeable delivery (BESS discharge windows, hybrid co-located control). Complements Firm for controllable offtake. Recommended for BESS and Hybrid alongside Firm
Installed Cap. (MWp) * nameplate DC size of the plant (panels STC, turbine rated MW, or BESS max DC discharge). Always ≥ Export Cap. — DC is clipped by inverters and the grid limit. i tooltip on the field
Export Cap. (MW) * maximum AC power you may inject at the connection point — the hard ceiling for wheeling contracts. Also drives P50: Export × 8 760 × (Capacity Factor ÷ 100). i tooltip
Inverter Cap. (MVA) total inverter fleet rating (real + reactive). At unity power factor MVA ≈ MW; if this sits below Export Cap., inverters become the binding export limit. i tooltip (left)
Strategy Supply Classes — technology recommends, then you can multi-select (illustrative · Tshwane Solar Park vs Jozi Grid BESS)
1solar plant
TechnologySolar PV
recommends→
Supply classSolar
2battery plant
TechnologyBESS
recommends→
Supply classesFirm + Flexible
3matching
Site eligible forthose classes
intersects→
Trader pool Supply rolesmembership only if overlap

Note. A trader pool only accepts the plant when at least one of these classes intersects the pool’s Supply roles (§5.3). Adding Flexible beside Firm widens which dispatchable books can pick you up.

Capacities in plain language — DC plant → inverter fleet → grid export ceiling (illustrative · wizard Solar PV defaults)
Ainstalled
Nameplate DC75.000 MWp
Binverters
Inverter fleet65.000 MVA
clips DC→
Usable AC before grid limit≤ 65 MW
Cexport
Connection agreementExport Cap. 60.000 MW
hard ceiling→
Max wheeled injection60 MW

Step 4 · Business — The step-up transformer. All fields required. Choosing Voltage Category cascades the allowed ratios, ratings and vector groups so you cannot pick an illegal combination.

Field Notes
Voltage Category * high-level step-up class — drives which voltage ratios, ratings, vector groups and cooling options appear; must match the approved single-line diagram. i tooltip. Options:
  • LV → MV — steps low voltage up to medium voltage (e.g. inverter LV to 11 / 22 / 33 kV)
  • MV → MV — medium-to-medium conversion between distribution levels (e.g. 11 kV to 22 / 33 kV)
  • MV → HV — medium voltage up to high voltage for Transmission / HV injection
  • LV → HV — low voltage stepped straight to high voltage (less common; long step-up)
Voltage Ratio * primary / secondary voltages on the transformer (e.g. 11 kV / 22 kV). Offered list depends on Voltage Category; must match the network boundary voltages in the connection approval. i tooltip
Transformer Rating * nameplate MVA of the unit — offered per Voltage Category (e.g. LV→MV up to ~10 MVA; MV→HV up to ~63 MVA). Can limit Export Cap. i tooltip
Vector Group * winding connection and phase-shift code from the SLD (e.g. Dyn11). Options cascade with category (Dyn / Yyn / Yd / Ynd families). Used for protection coordination and parallel operation with the network
Impedance % * short-circuit impedance offered for the chosen rating — used in network studies
Cooling Type * how the transformer sheds heat — affects thermal rating and overload capability. i tooltip (left). Options:
  • ONAN — Oil Natural Air Natural; most common for IPP step-up transformers
  • ONAF — Oil Natural Air Forced; fans add capacity for higher loading
  • ONAN/ONAF — dual mode: natural cooling at light load, forced air when hotter
  • OFAF — Oil Forced Air Forced; pumps and fans for high-performance heat dissipation
  • AN — Air Natural; dry-type indoor transformers (no oil)
  • AF — Air Forced; dry-type indoor with fans
Ownership fixed to IPP — the platform’s wheeling model assumes the generator owns its step-up transformer; you cannot select Eskom or Municipality here
Transformer cascade — pick the category first; the wizard only offers legal combinations (illustrative · LV → MV)
1category
Voltage CategoryLV → MV
2offers
Voltage Ratio0.4 / 11 · 0.4 / 22 · …
+
Rating · Vector · Coolingmatching list

Step 5 · Consumption — Expected yield and when it arrives (optional to skip, but do it — strategy and contracting lean on these numbers). The banner says so: correctly completing this step feeds a recommended tariff structure when you later deal with a trader or off-taker.

Field Notes
Capacity Factor (%) * slider — what share of “full export, all year” the plant actually delivers. Open the CF Calculator drawer (calculator button beside the field) to derive it from a metered sample — see CF Calculator below. Typical solar defaults around 22 %; wind around 40 %. Technology suggestion ranges appear under the slider. i tooltip
P50 Annual Energy Yield (MWh) * annual energy with a 50 % chance of being exceeded over the plant life — the number counterparties use for PPA sizing. With Auto-calculate on: Export Cap. × 8 760 × (CF ÷ 100). i tooltip
Generation split CSV optional — click or drag-and-drop a .csv only. Required columns: date_time_stamp (aliases: date_time_Stamp, datetime_stamp, date_timestamp), peak_kwh, standard_kwh, off_peak_kwh. Invalid format is discarded with listed issues. Valid files sum energy per TOU bucket and set Peak / Standard / Off-Peak % (must total 100). Download demo CSV fetches priv/data/offtaker_consumption_data.csv
Peak % · Standard % · Off-Peak % how annual energy splits across Eskom’s three time-of-use buckets. Must sum to exactly 100 %. The three buckets:
  • Peak % — share generated in expensive peak hours (weekday mornings/evenings on the Eskom TOU calendar)
  • Standard % — share in shoulder / standard hours between peak and off-peak
  • Off-Peak % — share in cheap night and weekend hours
Technology presets (Peak / Standard / Off-Peak):
  • Solar — 15 / 50 / 35 — little night energy; most daylight sits in Standard
  • Wind — 20 / 45 / 35 — flatter across the day than solar
  • Baseload — 16 / 48 / 36 — near-flat (hydro / firm-style) shape
CF Calculator

Why it exists. Capacity Factor is the share of “full export, all year” the plant really delivers — counterparties and P50 sizing lean on it. If you already have interval generation readings (SCADA, meter extract, or a commissioning sample), the CF Calculator turns that sample into a suggested % instead of guessing the slider.

Click CF Calculator beside Capacity Factor. A drawer opens from the right. On open it seeds Generation Power as Export Cap. × (current CF ÷ 100) with a 15-minute interval and 24 sample hours — a starting point you replace with your metered numbers.

Input What it is
1. Data Reading Interval (Minutes) length of each generation reading in the sample. Options: 5 (ratio 0.0833), 10 (0.1667), 15 (0.25, default), 30 (0.5), 60 (1.0). The interval ratio scales average power into energy for that reading length
2. Total Hours in Sample how long the sample covers (e.g. 24 for one day, 168 for a week)
3. Generation Power (MW) average AC export power over that sample (not nameplate Installed Cap.)
(from Step 3) Export Cap. (MW) baseline ceiling — read-only in the results panel; theoretical full-export energy for the sample is Export × Hours

What it calculates

  1. Actual Energy (MWh) — Interval Ratio × Generation Power × (60 ÷ Interval × Hours)
  2. Capacity Factor (%) — Actual Energy ÷ (Export Cap. × Hours) × 100, then clamped to 0–100

Apply to Wizard writes the rounded CF onto the slider and, when Auto-calculate is on, refreshes P50. Cancel closes without changing the step.

CF Calculator — 24-hour sample at 15-minute intervals on a 60 MW export plant (worked arithmetic)
1inputs
Interval15 min · ratio 0.25
+
Sample hours24 h
+
Avg generation18.000 MW
2actual
Actual Energy0.25 × 18 × (60÷15 × 24) = 432 MWh
3baseline
Full export over sample60 MW × 24 h = 1 440 MWh
4result
Capacity Factor432 ÷ 1 440 × 100 = 30.0 %
Apply→
Wizard CF + P5030 % → 157 680 MWh/yr

Follow along. Seat: IPP 2 (ipp_2@webill.net). Path: IPP Sites → Add New Site → Step 3 set Export Cap. 60 MW → Step 5 → CF Calculator. Enter Interval 15, Hours 24, Generation Power 18. You should see Actual Energy 432 MWh, Capacity Factor 30.0 %. Apply to Wizard sets the slider; with Auto-calculate on, P50 becomes 60 × 8 760 × 0.30 = 157 680 MWh.

Note. Generation Power is the average export over the sample, not a single peak reading. A sunny midday spike alone will overstate CF; use a full day (or longer) that matches how the plant usually runs.

P50 from export and capacity factor — wizard Solar PV defaults (worked arithmetic)
1inputs
Export Cap.60.000 MW
×
Hours in a year8 760
×
Capacity Factor22 %
2result
P50 Annual Yield60 × 8 760 × 0.22 = 115 632 MWh
TOU split — same annual energy, three clocks (illustrative · Solar preset 15 / 50 / 35)
PPeak
Expensive hours15 %
SStandard
Shoulder hours50 %
OOff-Peak
Cheap / night hours35 %

Careful. If Peak + Standard + Off-Peak ≠ 100 %, the step stays incomplete and Register IPP stays disabled. Solar plants put little energy into night Off-Peak; wind and BESS look different — that is why the presets change with technology.

Step 6 · Preferences — Grid paperwork, NERSA licensing & proposal inputs. Which connection-reference fields appear depends on Connection Type from Step 1. The commercial and forecast choices are recorded once on the plant and provide the starting position for each physical-PPA proposal; the final contract terms remain negotiable.

Field Notes
Grid Connection Status card pick — how far the plant is along the connection journey:
  • Operational — grid connection is live and the plant can inject
  • Connected — physically wired, still pending commissioning
  • Budget Quote Received — Eskom or municipality budget quote obtained; build / connect not finished
  • Application Submitted — connection application lodged; quote not yet in hand
(Eskom only) Grid Connection Approval * approval reference for the connection
(Eskom only) CUOSA Reference * Connection and Use of System Agreement number issued by Eskom. i tooltip
(Eskom only) Regulator Code Date * when the IPP achieved compliance with the relevant Grid Code. i tooltip
(Municipality only) Municipal Connection Agreement * the municipal connection agreement reference instead of the Eskom trio
Excess Generation Preference * the seller’s default commercial treatment for energy that cannot be delivered to its PPA buyer:
  • Forfeited — no value is recovered
  • Banked — credit it for later buyer use
  • Eskom Buy-back — sell it through an active Eskom buy-back arrangement
  • Third Party — sell it to another eligible buyer or market
  • Discounted Credit — credit the buyer at a discounted rate
Eskom Buy-back Status * the factual status of the arrangement that makes Eskom buy-back available: No arrangement, Application pending, or Active. Choose Active only once the signed arrangement is operational.
REC Registry * where the plant issues renewable-energy certificates: Not registered, ZARECS, I-REC, or a supported Blockchain registry. Not registered is an explicit answer; it stores no registry on the plant.
Wheeling Forecast Status * the status of the three-year wheeling forecast required by the network operator: Submitted, Pending, or Not required. Pending is not a confirmation that the registration condition has been met.
Schedule 2 Exemption toggle (default on):
  • On — plant falls under Schedule 2 (no full NERSA generation licence); licence fields must stay empty
  • Off — you hold a NERSA generation licence; Number, Issue date and Expiry date become required
(if not exempt) NERSA License Number , Issue date , Expiry date * required together when Schedule 2 is off

Note. Schedule 2 on means the licence fields must stay empty; Schedule 2 off means all three licence fields are required — the wizard will not let you mix the two.

On the onboarding form, Create open site record on the readiness gate registers the site once the six core sections are complete (§4.3) — Open, or Active when the project stage is Operational; §4.8 explains when and how you promote it. The form’s Identity map can also place a point of connection away from the plant pin — §4.3A.

4.3 Editing, and what locks

One form creates and edits every generator site: generator site onboarding (/org/ipp-sites/onboarding/…). It has eight sections — Identity & location, Plant & technology, Connection & network, Metering, Regulatory evidence and Generation profile (the six core sections), then Market standing data and Commercial defaults (optional). Complete them in any order; each section saves on its own.

A new site starts blank. Add New Site — the round + on either IPP Sites tab — opens /org/ipp-sites/onboarding/new. The click creates nothing, and the page says so: the eyebrow reads NEW GENERATOR SITE, there is no Draft chip in the top bar yet, the save state beside the progress bar reads Not saved yet · your first answer starts the draft, and the box beside it reads Nothing saved yet — Create site unlocks once the 6 core sections are complete. The browser tab reads New IPP site · IPP Sites · Webill Green. Then:

flowchart TB
  A[Press the round plus] --> B[Blank form at onboarding/new]
  B --> C{First answer entered?}
  C -->|No, then Save and exit or Cancel| D[Nothing kept, back to Sites]
  C -->|Yes| E[Draft created]
  E --> F[Address becomes onboarding/draft id]
  F --> G[Draft listed under IPP site drafts]
  G --> H[Review readiness]
  H -->|Six core sections complete, no values to fix| I[Create open site record]
  1. Moving between sections of a blank form saves nothing, and neither does ticking a map box or Same as site location, or pressing Check & mark complete. Only an answer does.
  2. The first answer you enter creates the draft. The address changes to the draft’s own /org/ipp-sites/onboarding/{id}, so a reload or the back button returns to the saved draft. It now appears under IPP site drafts on the register, and the browser tab reads {name} · IPP site draft · Webill Green.
  3. Before that first answer, Save & exit says Nothing was entered, so no draft was kept. and Discard is a plain Cancel button (no confirmation) that says Nothing was saved, so there was no draft to discard. Once a draft exists, the top bar shows Draft, Save & exit says Draft saved. Resume it from IPP site drafts., and Discard asks first and deletes the saved draft.
  4. The progress line reads N of 6 core sections complete · 2 optional. The box beside it reads Draft saved — N sections to finish before the site can be created — until nothing is left, when it reads Ready to create site — The core sections are complete and their values check out. Only the six core sections move the bar, so it can reach the end while the two optional sections are still empty.
  5. Review readiness opens the readiness gate, a modal with the branded green header: eyebrow READINESS GATE, title Create generator site (or Save generator site when editing), and a close X labelled Close readiness review. Escape closes it too, and keyboard focus stays inside it while it is open.
  6. The gate lists all eight sections with their status — a section with a value to fix shows Fix values (§4.3B). Every row is a button: press one and the gate closes and that section opens. While core sections are missing, the amber note reads The draft is safe, but not ready. Open a section below to finish it. — or, on a blank form before the first answer, Nothing is saved yet. Open a section below to start; the draft is kept from your first answer. Both then say that late-stage evidence is requested only when the selected milestone makes it applicable.
  7. When the six core sections are complete and no section has a value to fix, Create open site record creates the site — Open, or Active when Project stage is Operational (§4.8). The button sits in the gate’s footer, below the list, so it stays in view on a short window.

Moving through the sections. Each section’s header counts Core section N of 6 or Optional section N of 2, the same way the progress bar does. On a window 1,280 px wide or more, the Site checklist sits beside the form and stays in view as you scroll. On a laptop-width window it sits above the form as a compact two-column grid of section names and statuses, so the form starts near the top. Either way, picking a section brings the form into view. At the foot of every section, Next: {next section} opens the next one, and the last section offers Review readiness instead. A saved draft reopens on its first unfinished core section, not on the last one you visited; if the connection drops and the page reconnects mid-edit, you stay where you were.

Explanations, at the top right of each section, opens plain-language notes on that section’s fields; press a choice to fill the field. On a wide window the panel sits beside the form, and the checklist shrinks to a column of section icons, each with a status dot — hover or focus one for its name and status. On a narrower window the panel opens over the page with a dimmed backdrop. X, the backdrop or Escape closes it. A label with an ⓘ explains its term on hover or focus — among them COD (commercial operation date), MEC (maximum export capacity), NMD (notified maximum demand), CUOSA (the connection and use-of-system agreement with Eskom), Nameplate basis (for solar, DC STC: the panels’ direct-current rating under standard test conditions) and Three-year forecast status.

Market standing data has no form and no Check & mark complete. It explains that the market registry keeps each unit’s market facts and versions every change, links to it with Open market registry, and offers Next: Commercial defaults.

Editing a live site. Edit complete site record, in the site workspace’s Site details (§4.1), opens the same form already filled from that plant — name, technology, capacities, meters, yield and the other sections you have on file. The browser tab reads Edit {name} · IPP Sites · Webill Green. Saving writes the same site; it does not register a second plant.

Address search and plant map clicks stay locked after registration — you cannot move the generating-plant pin. The Site and Point of connection overlay ticks stay live so you can hide a marker or still place the electrical node (§4.3A). Network service provider (#onboarding-nsp) on Connection & Network lists Eskom and, when the plant pin is inside a municipal boundary (or you have not placed a pin yet), Municipality. On a new draft you choose the operator there. After registration, Save changes does not rewrite the live site’s connection type — the wires you already filed stay. Everything else (name, meters, technology and capacities, transformer, yield/TOU, regulatory references, excess-generation preference, buy-back status, REC registry and wheeling forecast status) stays editable. Save changes on the readiness gate writes the update. Add New Site always starts a blank form; only Edit complete site record reuses a live site.

4.3A The identity map — plant and point of connection

The generating plant is not always where it meets the wires. Think of the plant as the house and the point of connection as the meter box on the street pole: often nearby, sometimes a substation down the road. Buyers and the network need both pins — the house, and the pole.

On generator-site onboarding (/org/ipp-sites/onboarding/…) the Identity & location section has one map. Two tick boxes sit above the canvas (#onboarding-map-overlay). They are ordinary form checkboxes — brand green when on — not the Deals / Contracts tab bar. Each box only shows or hides its marker. Unticking does not clear the longitude or latitude fields; tick again and the same pin comes back.

Tick (id) What it shows What a map click does while it is on
Site (#map-show-site) The generating-plant pin (amber circle marked S) If Point of connection is off, and the plant is not locked, a click places or moves the plant. That fills the physical address, province or state, plant longitude / latitude, and — in South Africa — municipality
Point of connection (#map-show-poc) The electrical-node marker (indigo square marked P) A click places or moves the node. That fills Point of connection longitude and Point of connection latitude only — the plant pin stays put

Both ticks start on. You may turn either off, or both. A click prefers the node whenever Point of connection is ticked. If both are empty, a click does nothing.

A point of connection is the electrical node where this plant meets the network. The two coordinate fields under the map are read-only: you do not type them. They follow the square marker.

If there is no square marker yet — a new draft before an address, a draft whose address was cleared, or Edit on a live site (Edit prefills the plant pin, not a separate node) — leave Point of connection ticked and click the map. The square marker appears at the click. The longitude and latitude fields update to that click. Click again, or drag the square, to move it.

Same as site location (#poc-same-as-site) is a tick box under the hint. Tick it when the electrical node is the plant: the square jumps onto the amber site pin, and the two POC fields copy the plant longitude and latitude. The tick is brand green when on — the same checked look as every other form checkbox. If the plant pin is not placed yet, the box stays empty and a flash says to place the site pin first; the form does not invent a node.

Type at least six characters in Physical address for suggestions. The arrow keys move from the box into the list and back, Enter picks the highlighted suggestion, and Escape returns to the box.

When you first pick a physical address, the node defaults to the plant and the box is ticked. That is a starting guess, not a locked answer. Click or drag the square somewhere else and the box unticks. Tick it again to snap back to the plant.

After registration, Edit still locks address search and the plant pin. Point-of-connection clicks and Same as site location stay allowed — the plant pin does not move; the node can still match it or sit apart.

On Connection & Network, Network service provider (#onboarding-nsp) is a select, not a locked empty box. Eskom is always listed. Municipality appears when you have not placed a plant pin yet, or when that pin sits inside a municipal boundary that wheels — the same rule as Connection Type in §4.2. A pin in open country lists Eskom only.

flowchart TB
  A[Open Identity and location] --> B{Is the node on the plant?}
  B -->|Yes| C[Tick Same as site location]
  C --> D[Square sits on the plant pin]
  D --> E[Longitude and latitude copy the plant]
  B -->|No, or no square yet| F[Leave Point of connection ticked]
  F --> G[Click the map or drag the square]
  G --> H[Fields follow the click]
  G --> I[Same as site location unticks]
  1. Open IPP Sites and press the round + (Add New Site), resume a draft, or press Edit complete site record in a site’s Site details.
  2. Stay on Identity & location.
  3. If the node is the plant, tick Same as site location.
  4. Otherwise leave Point of connection (#map-show-poc) ticked.
  5. If the canvas has no indigo square, click the map once.
  6. Read Point of connection latitude and Point of connection longitude — they now match that click, and the tick box is empty.
  7. Open Connection & Network and choose a Network service provider — at least Eskom is in the list.

Follow along. Seat: IPP 2 (ipp_2@webill.net). Path: Organisation door → IPP Sites → + (Add New Site; or Edit complete site record in a site’s Site details) → Identity & location. Tick Same as site location after the plant pin is set — the indigo P square sits on the plant and the fields match. Then click away from the plant while Point of connection is ticked: the box unticks and the fields follow the new click. Untick Site or Point of connection — the marker hides, the numbers stay. Open Connection & Network and open Network service provider (#onboarding-nsp) — Eskom is there to choose.

Note. The overlay ticks and the separate node live on the onboarding form — for a new site and on Edit.

Where this is taught. Who owns the wires: §4.2. What Edit locks: §4.3.

4.3B When a section counts as complete

The form saves as you type, so it also saves a typing slip: an operating life of −5 years, or more export than the plant has installed. A checklist that only asked “is it filled in?” would pass those, and the site would be created with numbers nobody can use. So a section counts as complete only when every required answer is in and its values check out.

Fix values. A value that fails a check keeps its message under the field as soon as it saves. The value is still saved, so nothing you typed is lost. The section shows Fix values in the Site checklist and on the readiness gate, and Create open site record waits until it is fixed. Correct the value and the section moves on by itself. When you edit a live site, Save changes stays off while any section shows Fix values; a blank field on an older record does not hold it back.

A blank field is never a failed check — it is still needed. Only the fields your chosen technology or pathway shows are checked, so a value left behind by an earlier choice cannot block a section.

Section What is checked
Identity & location Operating life is a whole number of years from 1 to 100
Plant & technology Installed, export and converter capacity are more than 0. Export is no more than installed capacity, and the converter (MVA) is at least the export capacity (MW). Batteries: round-trip efficiency 50–100 %, maximum SoC above minimum SoC. Thermal plants: heat rate at least 3.6 GJ/MWh, minimum stable load no more than installed capacity
Connection & network MEC and NMD are not negative; transformer impedance is above 0 % and at most 100 %
Metering CT and VT ratios are more than 0
Regulatory evidence The issue date is not before the application date; a generation licence expires after it is issued
Generation profile Capacity factor above 0 % and at most 100 %; P50 and P90 more than 0; P90 no more than P50; P50 no more than the plant could make at full power all year (installed MW × 8,760 h); losses, degradation and auxiliary load 0–100 %; once any time-of-use period is entered, peak, standard and off-peak add up to 100 % (±0.5)
Commercial defaults Minimum insurance cover and the plant emissions factor are not negative

Check & mark complete is the question “is this section done?”, with the answer given beside the button you pressed:

flowchart TB
  A[Press Check and mark complete] --> B[Section saved]
  B --> C{Every required answer in, every value checks out?}
  C -->|Yes| D[Green note: the section is complete]
  C -->|No| E[Rose note above the button]
  E --> F[Press a name to jump to its field]
  F --> G[Fix it, and the note updates as you type]
  G --> C
  1. The button, at the foot of each section, saves the section. On a blank form it saves nothing and only shows what the section needs.
  2. When the section is done, a green note above the button reads {Section} is complete. Every required answer is in and the values check out. An optional section reads {Section} checks out. It is optional, so nothing here holds back the site.
  3. Otherwise a rose note counts what is left — for example 4 answers still needed and 1 value to fix — then lists Still needed:, each blank answer as a small button, and To fix:, each failing value. Press any of them to jump to that field.
  4. Every blank required field in the section is marked Required at once, so you see the whole list rather than one browser bubble at a time.
  5. The note follows your edits: fix the last item and it turns green.

When two answers disagree. Capacity factor and P50 describe the same year’s energy twice, so the form compares them. Take 10 MW installed at a 25 % capacity factor: 10 × 8,760 × 0.25 = 21,900 MWh a year. If P50 says 1,000 MWh, the Generation profile shows an amber note: A 25 % capacity factor on 10 MW installed comes to about 21,900 MWh a year, but P50 is 1,000 MWh. Check that both describe the same plant. Two buttons fix it either way: Set P50 to 21,900 MWh, or Set capacity factor to 1.1 % (1,000 ÷ (10 × 8,760) = 1.1 %). This is a warning, not a failed check, and it never holds the section back: a capacity factor is often quoted on the export (AC) rating instead of the installed (DC) one, so the note appears only when P50 sits more than 20 % away from both readings.

Plant emissions factor, on Commercial defaults, starts blank. It is the plant’s own emissions for each unit of energy — solar, wind, hydro and battery plants usually report 0 — so no grid average is filled in for you, and clearing the field leaves it blank. The unit beside it (g CO₂/kWh or t/MWh) converts the number you see; the saved value is always t/MWh.

4.4 BRP — Trading Unit and zone

Each site’s BRP cell sits in its workspace’s Site details (§4.1). The cell is blank until the organisation is an ACTIVE Market BRP with a BRP reference — a filed application that is still pending does not unlock it.

Once that seat is active: if the site is registered as a generating Trading Unit, the cell shows the TUID above the network zone (same colour swatch as the SO/MO zone register). Click either to open /org/trading-units.

If the site is not in a published network zone, the cell says No Market Zone instead of offering registration.

If there is no TUID and the site is allocated, Register with Market opens the standing-data wizard (sticky tabs; Register appears only when every required field is complete).

Where this is taught. Every tab and every input: V9 §3.7. The four-seat wizard map: V9 §3.9B.

Where a registered site’s location is not covered by the map, the zone line says Unassigned and names the nearest zone. A notice above the table explains what that blocks. The nearest zone is deliberately not used as an assignment: putting the site there would place it in the wrong balancing group.

Nothing about the site itself changes, and nothing about today’s trading is affected until the unit is registered. The full zone treatment is V12 §2.

4.5 What the market registry adds to a site

The zone decides which market registration a site can join. The site’s meter decides who the market thinks is on the other side of its energy.

Every metering point in the market carries a counterparty — the party taking what this plant injects. The platform derives it from your signed PPAs, so a site with contracts in place usually needs nothing entered. Two situations reach you:

Both live at BRP / Market → Market registry, taught in V9 §3.

4.6 And what the market asks about the plant itself

A site record says what the plant is: technology, installed capacity, export capacity, transformer, expected yield. The market asks a different question — what the plant can do, minute by minute — and requires an engineering review. Optional plant profiles now capture several of these answers:

That last one is worth pausing on. This screen holds installed capacity, inverter capacity and export capacity, and the market wants exactly one number: the most the plant can send out continuously. Export capacity is closest and is not automatically right — export capacity is sometimes set by a grid-connection agreement rather than by what the plant can produce. The platform will not pick for you, and it records which you chose and why, because the market requires the top of your price ladder to equal that figure exactly.

For solar and wind most of the rest is genuinely zero. For anything with a turbine they are real numbers from a plant engineer, and a zero that stands in for an unknown is the most expensive entry you can make — see V9 §3.8. Review the captured profile and the remaining answers at BRP / Market → Standing data.

Follow along. Seat: IPP 2 (ipp_2@webill.net). Path: IPP Sites. You should see five sites — IPP2 Atlantis Wind (Wind 80/70, Municipality/Cape Town), Tshwane Solar Park (Solar 90/75, Eskom, 132kV), Durban Coastal Wind (Wind 100/90, Eskom), Jozi Grid BESS (BESS 50/40) and Rosslyn BESS (BESS 20/5 — the deliberately tiny battery). Stat cards: 340 MWp installed, 280 MWac export.

Data. full_demo · seed 42 · stage S03 (parties) · sealed 2026-07-15.

4.7 Optional plant profiles

The final wizard step captures technology-specific engineering data. Its Skip / clear profile action preserves default forecasting. Hydro inflows have twelve monthly cells; thermal profiles capture heat rate and ordered start costs; hybrids select same-organisation components. Read the captured card on Overview inside Solar PV / Wind / … assumptions & forecast basis (V4 §4.2). See V4 §18 for validation and default-versus-measured precedence. Captured profiles now supply the available registry engineering fields; the Standing data review still owns missing and assumed values.

Step 7 · Solar

Capture tracking, panel orientation, degradation and losses. If DC/AC ratio is omitted, the card derives it from installed DC capacity divided by inverter capacity. Weather performance parameters remain on the effective-dated SiteCurve.

Step 7 · Wind

Capture turbine count and rating, hub height and availability. A nameplate mismatch is a warning. A conflicting existing wind-curve hub height must be resolved before saving.

Step 7 · Hydro

Choose run-of-river, storage or pumped storage. Declare daily/weekly energy limits and twelve inflow factors if available. Unknown water-authority and storage engineering remain missing in the registry projection.

Step 7 · Thermal

Capture cycle, matching fuel, heat rate, operating cost, ordered start costs and operating limits. Heat rate below 3.6 GJ/MWh is refused. Missing fuel or emissions references leave cost unavailable.

Step 7 · Hybrid

Select same-organization solar or wind components and optional active BESS. The shared cap cannot exceed registered export capacity. A component can belong to only one composition, and a book cannot count both its composite and its generation component.

4.8 Site status — Open, Active, Inactive

Think of the plant record as a shop front. The shop can be fitted out but not yet open to trade (Open), trading (Active), temporarily shut with the sign still on the door (Inactive), or closed for good (Closed). That shop-front word is the generator site status in the register’s Status column — not the grid-connection milestone, not a contract state, and not the onboarding draft. The buttons that change it sit in the site workspace: Site details → Site lifecycle & fleet membership (§4.1).

Status What it means Button in Site lifecycle & fleet membership
Open The plant is registered and can be matched to buyers, but you have not marked it operational yet Activate (#ipp-site-activate-{id})
Active The plant is the live operational record Deactivate (#ipp-site-deactivate-{id}) — rose hover, asks first
Inactive You took it off the live floor; the register row and history stay Activate
Closed The site is closed for new activity Activate (same restore as Inactive)

How a site becomes Open. Every new site comes from the generator site onboarding form (Add New Site, the round +): Create open site record writes Open unless Project stage is Operational, in which case it writes Active. Project stage is only on the draft (Early development · Grid application · Construction · Commissioning · Operational). Once the site exists, that stage is not stored on the plant and Edit does not change status.

How Open becomes Active. Open the site’s workspace, press Site details, open Site lifecycle & fleet membership, and press Activate. The register’s Status reads Active with a green dot, and the button becomes Deactivate. The fold stays open after the press. Nothing else flips it: not COD arriving, not grid connection becoming Operational, not signing a PPA, and not Save changes in onboarding.

How Active becomes Inactive. Press Deactivate in the same fold. Confirm the prompt (Deactivate this site? It is marked Inactive and stays in the directory; Activate puts it back to Active.). The status reads Inactive, and the button becomes Activate, which puts it back to Active.

flowchart LR
  Draft[Onboarding draft] -->|Project stage is Operational| Active[Active]
  Draft -->|Any earlier stage| Open[Open]
  Open -->|Activate| Active
  Active -->|Deactivate| Inactive[Inactive]
  Inactive -->|Activate| Active
Generator site status on IPP Sites
OPEN
→Activate
ACTIVE
→Deactivate
INACTIVE
Also in the register: CLOSED

Closed is a stored status with no separate Close chip. Activate on a Closed or Inactive site writes Active. Matching still treats Open and Active sites as candidates for new counterparties.

Follow along. Seat: an Organization door with at least one Open generator site (onboarding with a pre-operational project stage, or a demo plant seeded Open). Path: sidebar IPP Sites → Sites → the site’s name → Open site workspace → Site details → Site lifecycle & fleet membership → Activate. You should see the status become Active and the button flip to Deactivate.

Careful. Grid connection status (Application submitted · Budget quote received · Connected · Operational) is a different field. A plant can be Open and already Connected, or Active and still waiting on a quote. Change connection status in Edit; change the shop-front badge with Activate / Deactivate.

5. Trader pools — the commercial layer

A trader pool is a licensed trader’s trading vehicle: no site, no meter — a bundle of rights, treatments and protections under which it buys from generators and sells to consumers. One organization can run several pools with different policies (a renewables pool, an industrial pool, a metro pool…).

Where this is taught. The trader directory and strategy tabs: V6 · Trader. Creating and editing a pool on the onboarding workspace: V6 §2B. This chapter keeps the entity, directory and market-registration picture.

5.1 Accreditation gates the door

If your organization isn’t accredited (§2), the directory shows an amber notice instead of the create button: “The Organization has not been accredited to trade either by Eskom or by any municipality which supports wheeling.” Fix §2 first.

5.2 The directory

Trader Pools (sidebar) — “How each pool is trading, which one needs you, and where to go — the register of pools underneath.”

The landing. The page opens with what the fleet is doing, before any table: a verdict written from the numbers (“1 of 4 pools trade. T1 Renewables Pool is long with no buyer for 96 % of its supply, and the plan loses R 12.2 m a month until it sells; the other 3 have no members”), five fleet tiles in a trader’s words (coverage · margin at plan · margin at risk against its limit · spill · shortfall — unmet demand as a share of demand, the same SHORTFALL_PCT as the book (#trader-pools-stat-shortfall) — pools without members are not averaged in). A pool that has never run, or a fleet with no trading pools, shows — on Shortfall, the same dash as Spill and Coverage. Then a Needs you rail ranking the pools that want attention with a link to the screen that fixes each, and one quiet card per pool. The card is a two-second scan: name, status badge, the one-line subtitle, the tone pill, and the vitals as inline figures (or the one-line verdict on a not wired card). Click the card to open the detail drawer (#fleet-detail-drawer). A pool with nothing to judge gets a dashed not wired card that says what the one setup step is; zeros are never shown as health. Grades (forecast, estimated) say where the figures come from. The landing loads with the page.

The detail drawer. Click a card and a right-hand panel opens with the branded header (eyebrow Trader pool, the pool name, close). The drawer carries one chip per registered Trading Unit — its id and its market zone with the zone’s colour dot, each opening the Trading Units register — or, only while the pool has no Trading Unit, Register with Market; then Regulator (the NERSA-style preview drawer) and Counterparties (the match search). Then the verdict, the vitals as compact tiles, the top Move, and the navigation chips — Overview · Book · Desk · Dashboard · Contracts · Edit · Archive. They are all neutral until hovered — green, except Archive, which hovers rose because it is the one destructive action. Archive asks first, then marks the pool Suspended; a pool that is not Active shows Activate in the same place, which puts it back to Active. Escape, the backdrop, or the header close shuts the drawer. Search, the Status filter and the name sort sit under the fleet tiles.

The landing filters by Status (All / Active / Suspended / Expired / Revoked):

Column What it shows
Pool Name public (green check) / private (red cross) dot; name with the status badge beneath it (Active · Suspended · Expired · Revoked)
BRP blank unless the organisation is an ACTIVE Market BRP with a BRP code. Then: a count of registered Trading Units — hover for each TUID and colour-coded zone; click the count to open Trading Units. Otherwise Register with Market opens the pool Trading Unit wizard (any published zone; one unit per selected zone)
Physical · Virtual non-clickable counts of AGREED / SIGNED / ACTIVE physical PPAs and virtual PPAs (— when none)
Actions Strategy (straight to the pool’s book — no seeding step; trader books seed themselves) · Regulator Preview (document-check icon — same NERSA-style drawer as the create wizard) · Edit Pool

5.3 Creating a pool — the wizard, step by step

New Trader Pool opens the five-step wizard. You can jump to any step from the stepper; incomplete steps show a red warning (hover for what is still needed), completed steps a green check. There is no Continue button — Register Pool appears in the footer only when every step is green.

Think of the wizard as answering five plain questions counterparties and the regulator will ask later: who is this pool and is it licensed, where may it trade and which strategy roles does it claim, what may it do under its licence, how do network charges and imbalance land commercially, and what protections does it offer off-takers.

Step 1 · Core Profile — Identity, licence posture & marketplace visibility.

Field Notes
Pool Name * human label for the trading vehicle (e.g. T1 Renewables Pool)
Schedule 2 Exemption toggle (default on) — whether this pool claims Schedule 2 exemption from a full NERSA trading licence:
  • On — licence number and dates are not required (fields cleared)
  • Off — NERSA License Number , issue and expiry dates become required; optional effective date
NERSA License Number * shown only when Schedule 2 is off — the licence identifier on the NERSA certificate
License Issue Date * · Effective Date · License Expiry Date * shown only when Schedule 2 is off — issue and expiry are required; effective date is optional (when the licence takes effect if later than issue)
Initial Pool Status * card pick — lifecycle state at registration. Must be Active to register (other picks show Registration Not Available):
  • Active — authorised and operational; required to create
  • Suspended — temporarily restricted (breach, missing approval, credit, etc.)
  • Expired — term ended; no new allocations except agreed close-out
  • Revoked — authority withdrawn
Public Pool toggle (default on):
  • On — pool can appear in counterparties’ market search
  • Off — pool stays private to your organisation

Step 2 · Network — Where the pool may operate, which strategy roles it claims, and whether it settles by nomination.

Field Notes
Network Access Rights * card pick — which wires the pool is accredited to trade across. Cards are disabled where your organisation’s accreditations (§2) don’t reach:
  • Eskom Only — national Transmission / Distribution only
  • Municipality Only — municipal distributors only
  • Both (Eskom & Municipality) — hybrid; needs both accreditations
Cross-Border Permission toggle (default off) — whether the licence/mandate allows energy that crosses national borders
Supply roles select all that apply (default Flexible) — which generator / trader supply pool archetypes this book’s strategy may take members from. Fixed at creation (locked when editing):
  • Solar — daytime PV shape; as-generated solar supply pools
  • Wind — variable wind profile across day and night
  • Firm — dispatchable / firmed capacity (BESS, hybrid firming)
  • Flexible — nomination-capable flexible supply into trader books
Demand roles select all that apply (default Trader Sales) — which off-taker demand pool archetypes this book may serve. An off-taker joins only when at least one of its Strategy Demand Classes (§3.2) intersects this list. Fixed at creation:
  • Industrial — heavy industrial load (factories, continuous processes)
  • Commercial — commercial / retail sites with daytime-biased demand
  • Municipal — municipal bulk / redistributor demand pools
  • Trader Sales — sales into another trader’s book as demand
Nomination capable toggle (default on) — a meterless pool settles by nomination rather than meter reads. Fixed at creation:
  • On — may submit nominations as supply into strategy books
  • Off — not nomination-capable for supply membership

Step 3 · Activities — What the licence allows, and what it forbids.

Field Notes
Permitted Activities * select all that apply (defaults: Buy / Sell / Wheel Energy) — the operational scope the pool claims under its mandate:
  • Buy Energy — contract for energy from an IPP or permitted seller
  • Sell Energy — on-sell or allocate energy to off-takers
  • Wheel Energy — arrange wheeling credits, nominations & settlement
  • Aggregate Generator — combine output from multiple IPPs
  • Portfolio Balance — manage aggregate generation/load mismatch
  • Market Participation — interact with market or balancing mechanisms
  • Forecasting — prepare/submit generation & consumption forecasts
  • Settlement — calculate invoices, credits, imbalance amounts
Licence Prohibitions & Restrictions optional multi-select — hard limits written into the licence or operating mandate:
  • No Generation — cannot act as a generator
  • No Distribution Grid-holding — cannot hold distribution grid assets
  • No Unregistered IPPs — cannot include unregistered or unauthorised IPPs
  • No Unregistered Offtakers — cannot allocate to unapproved off-takers
  • Capacity Limits Enforced — must observe capacity limits on contracts
  • No Market Speculation — cannot trade speculatively beyond agreed mandate
  • No Unilateral Tariff Modification — cannot change tariffs unilaterally

Step 4 · Commercial — How network charges and imbalance exposure are allocated.

Field Notes
Wheeling Charge Treatment * select all that apply — how Use-of-System / wheeling charges reach customers under this pool’s policy:
  • Full Pass-Through — charges flow to the nominated party at source cost
  • Blended — charges included in a blended energy price or service fee
  • Partial Pass-Through — some items passed through, others absorbed or capped
Balancing Cost Treatment * card pick (single) — who carries imbalance / mismatch exposure:
  • Trader-Borne — trader carries exposure, charging a spread/fee (default)
  • IPP-Borne — IPP carries shortfall / curtailment exposure
  • Offtaker-Borne — off-taker carries balancing exposure
  • Shared — split between parties under a defined allocation rule
  • Pass-Through — charges/credits passed through per formula
  • Market-Indexed — priced by reference to an external index or benchmark

Step 5 · Protections — Off-taker safeguards the pool commits to. Filter the cards by All / Pricing / Operations / Data & Audit. Sensible defaults are pre-ticked (Price Caps, No Unilateral Price Changes, Billing Transparency, Balancing Cost Protection, Dispute Resolution). At least one measure is required.

Field Notes
Off-taker protection measures * select all that apply — contractual safeguards offered to off-takers served through the pool:
  • Price Caps (pricing) — caps the maximum price or adjustment an off-taker may face
  • Price Floors (pricing) — protects against prices falling below an agreed minimum
  • Fixed Price Windows (pricing) — locks pricing for defined periods before review or reset
  • Transparent Indexation (pricing) — requires visible index sources, timing, and fallbacks
  • No Unilateral Price Changes (pricing) — blocks one-sided price changes outside the agreed process
  • Billing Transparency (pricing) — requires clear statement lines, evidence, and calculation support
  • Supply Continuity (operations) — covers residual or fallback supply when wheeled energy is unavailable
  • Curtailment Protection (operations) — allocates curtailment risk and any contractual relief
  • Balancing Cost Protection (operations) — limits or allocates balancing and mismatch exposure
  • Forecasting Support (operations) — requires tools, data, or cooperation for forecasts
  • Dispute Resolution (data) — procedure for invoice, data, tariff, or allocation disputes
  • Error Correction Rules (data) — correction periods and recalculation procedures
  • Independent Verification (data) — independent checks of meters, allocations, or invoices
  • Realtime Data Access (data) — operational visibility into generation, consumption, or allocations
  • Data Integrity (data) — reliable, validated, and traceable settlement data
  • Audit Trails (data) — evidence for regulatory, contractual, and financial audit

When all five steps are green, Register Pool appears in the footer.

5.4 Editing

Edit in the detail drawer (#trader-pool-edit-<id>) opens the same onboarding workspace used to create a pool (/org/trader-pools/onboarding/<case id>), prefilled from the live pool. It does not open a modal. Save writes the same pool — it does not create a second one.

Think of it as reopening the shop’s licence file, not opening a second shop. The chrome says Editing (not Draft). There is no Discard — you cannot throw the live pool away from here. Save & exit returns you to Trader Pools without writing the pool; section answers stay on the edit case so you can reopen them. Review readiness then Save changes writes the answers onto the existing pool and returns to /org/trader-pools.

Explanations (#trader-pool-onboarding-explanations) opens a right-hand list of plain-language notes for this section. Click a choice to fill that input. Close with the header X, or press the control again. Same drawer chrome as OffTaker site onboarding: branded green header, title Explanations, X top-right.

All fields stay editable regardless of contracts — a pool is policy, not priced physics — except the strategy compatibility classes (eligible supply and demand roles) and nomination capability, which are set at creation only and stay locked on the Network section.

flowchart LR
  A[Open a pool card] --> B[Drawer Edit]
  B --> C[Onboarding workspace in edit mode]
  C --> D[Save and exit]
  C --> E[Review readiness then Save changes]
  D --> F[Back to Trader Pools]
  E --> F

5.5 Registering the pool with the Market

The pool list carries a BRP column. It stays blank until the organisation is an ACTIVE Market BRP. After that:

Where this is taught. Identity · Zones · Finance, Select all zones, and the official-name pattern: V9 §3.9B.3.

The map itself is provisional — see V12 §2.

5.6 What the market registry adds to a pool

The pool is yours to shape. Once it trades, the market keeps its own record of the same sites, and the two are not identical:

Here (a pool) In the market registry
One pool, however many zones One Trading Unit per zone
Members are sites you added Points of delivery are the meters those sites are metered at
A member is yours alone Every meter has a counterparty — the party on the other side of the energy

The registry lives at BRP / Market → Market registry and is taught in V9 §3. Two things there change how you read this screen:

Follow along. Seat: Trader 1 (trader_1@webill.net). Path: Trader Pools. You should see four active public pools: Trader 1 Portfolio and T1 Renewables Pool (Both networks, Trader-Borne balancing, Full Pass-Through), T1 Industrial Pool (Eskom, Pass-Through, Blended) and T1 Metro Pool (Municipality, Shared, Partial Pass-Through + Blended). For contrast: Trader 2’s Trader 2 Portfolio is private, and Trader 3’s only pool is Suspended.

Data. full_demo · seed 42 · stage S03 (parties) · sealed 2026-07-15.

6. Meters and devices

Everything the platform ever settles, forecasts or charges starts at a meter. A meter is a device — a row in your organization’s device registry — and a site points at it directly.

6.1 The device record

Field Meaning
Device number the identifier everywhere on screen (e.g. MTR-NERSA-GEN-1002); searchable
Device type ELECTRICITY for wheeling meters (the registry also carries WATER, GAS, GENERATOR, CONCENTRATOR, LORAWAN)
Status ALLOCATED (owned by your org) · INSTALLED (on a site) · REMOVED · UNALLOCATED
Reads per day the expected read cadence — the wheeling standard is 72, one read every 20 minutes
Read indexes which registers the meter reports — TOU-split kWh (PEAK_KWH, STD_KWH, OFF_KWH), export registers for generators, kvarh, kVA…
Manufacturer / model the hardware, from the manufacturers registry
Comms how it reports (NBIOT, SIGFOX, CALLBACK, … or NONE)

6.2 How a meter attaches to a site

A generator site requires a meter — you cannot create one without it (the wizard creates or assigns the device as part of site creation). It may also carry an optional check meter, the independent second meter used for verification.

An off-taker site also registers its meters in the wizard (§3.2): you enter the primary meter number (and optional manufacturer / model) — there is no registry search — and Register creates the device and links it. An optional check meter is registered the same way as a second device. Without a primary meter the site has no consumption history, no settlement source, and its Consumption view will say “No meter is assigned to this site.”

Trader pools have no meter at all — that is the point of a trader: where a meter cannot speak, a nomination does (V3 §9).

6.3 What the meter measures

A wheeling meter reports cumulative registers — ever-increasing counters, one per TOU period, on each side:

The platform never uses a register value directly; it uses the difference between two consecutive readings — chapter 7 — which is why a missed reading never loses energy, only detail.

Follow along. Seat: IPP 2 (ipp_2@webill.net). Path: IPP Sites → IPP2 Atlantis Wind row → the meter is MTR-NERSA-GEN-1002, 72 reads per day. Every seeded site’s meter follows the same MTR-… convention.

Data. full_demo · seed 42 · stage S03 (parties: 16 meter devices) · sealed 2026-07-15.

7. From readings to intervals — the data pipeline

The problem: meters report cumulative counters at points in time; settlement, forecasting and strategy need energy per 20-minute interval, split by TOU period. The pipeline between the two is small, deterministic, and worth understanding once — every chart in the platform sits on it.

7.1 The pipeline

One meter’s data path — from register snapshots to the charts
1Readingcumulative registers at a timestamp
→
2Derivetwo consecutive readings → one interval
→
3Interval20-min kWh, split peak/std/off
→
4Roll-upsdaily & monthly series, auto-refreshed
→
5Consumerssettlement · strategy · charts
  1. A reading is a snapshot of the meter’s cumulative registers at one timestamp — at 72 reads/day, one every 20 minutes.
  2. The deriver subtracts the previous reading’s registers from this one’s, register by register. Deltas are clamped at zero (a cumulative register never decreases; noise is absorbed) and rounded to 4 decimals. Generator meters are read from their export registers, off-taker meters from their consumption registers — the result lands in the same shape.
  3. The interval row carries the period’s peak / standard / off-peak kWh plus its start and end time. A late or missing reading doesn’t lose energy — the next delta simply covers a longer window (the interval’s minutes say so).
  4. Roll-ups aggregate intervals into daily and monthly series per meter (peak/std/off sums plus covered minutes), refreshed automatically every hour.

Where readings come from depends on the environment: in demo builds, deterministic history is written by the setup’s backfill (stage S05 — twelve months, sealed and checksummed) and live ticks can be switched on explicitly (S15); in production they arrive from the meters’ comms. Either way, everything downstream is identical.

7.2 The consumption explorer

A site row’s Meter action opens the consumption explorer. On an IPP site that is the modal “Meter {device number}”. On an off-taker site it is the Operations page. Both have two tabs. The figures below sketch what each tab looks like for OffTaker C Midrand DC (same numbers as the follow-along).

Where this is taught. On an off-taker site the explorer is inline on Operations. View energy data and choose a month, the Reads month and hourly coverage table, and Site location are in V5 §3.2–§3.4.

Consumption — a stacked bar chart split by TOU (red Peak, amber Standard, green Off-Peak). It drills three levels: All months → click a month → daily → click a day → 20-minute. The breadcrumb above the chart walks you back up. (“Tip: click a bar to drill into daily / 20-minute detail.”)

On All months, South African high season months (June · July · August) are shaded amber with bold amber axis labels; the other months are low season (slate labels). A legend above the chart names both — the same season split tariffs use (§8).

When you drill to a day, the breadcrumb and chart title show the weekday beside the date (for example 15 Jun 2026 · Monday).

On a generator’s meter the same explorer measures what the plant exported, so the chart titles say so: Monthly generation (kWh), Daily generation — {month} (kWh) and 20-minute generation — {day} (kWh). You meet it inline on an IPP site’s workspace, Operations tab, under Meter history & interval coverage. An off-taker’s meter keeps consumption in the same titles. On either kind, months after the current month are never shown as metered — a setup or lab run can write readings ahead, and the history does not present them as measured.

Consumption tab — OffTaker C Midrand DC · 2026
Peak Standard Off-Peak High season (Jun–Aug)

All months — TOU stacks

Monthly TOU stacks January to August 2026 Eight stacked bars; June through August sit in an amber high-season band; June totals 1,168,000 kWh. Jun · 1,168 MWh JanFebMarAprMay Jun Jul Aug

Read it: each stack is one month’s Peak + Standard + Off-Peak. The amber band is high season; June’s outline marks the month the follow-along opens (peak 205,333 + standard 481,600 + off-peak 481,067 = 1,168,000 kWh).

Day drill — 20-minute bars · 12 Jun 2026 · Thursday

Twenty-minute TOU bars for 12 June 2026 Thursday Twelve stacked interval bars across a daytime window; title shows weekday beside the date. 12 Jun 2026 · Thursday 06:0012:0018:00

Read it: each column is one 20-minute interval after you click a day. The title keeps the weekday beside the date; click a month first if you are still on All months.

Reads — the read-coverage view for a selected month: stat tiles (Reads, Expected in window, Gaps in window, Days w/ gaps) above a heatmap — one cell per hour per day; a fully-covered hour has 3 × 20-minute reads; the greener the cell, the more complete; red cells are missing reads. The offtaker page’s month picker and View hourly coverage data table are in V5 §3.3.

Reads tab — coverage heatmap (sketch)
Complete hour (3 reads) Partial Missing

Healthy month — almost every hour green

Read coverage heatmap for a complete settlement meter Seven day rows by twelve hour columns, nearly all green cells. Day 0246810121416182022 1 2 3 4 5 6 7

Read it: rows are days, columns are hours. Settlement-source meters in the demo look like this — Gaps in window = 0, Days w/ gaps = 0.

Gap hour — red cell (gallery device)

Read coverage heatmap with one missing hour Same grid with one red cell at day 14 hour 10; tiles would show Gaps in window 3 and Days w/ gaps 1. Day 0246810121416182022 13 14 15 ← gap Gaps in window 3 · Days w/ gaps 1

Read it: one red hour means three missing 20-minute reads. The deliberate demo gap lives on the gallery device in §7.3 — settlement meters stay complete.

When a meter has no consumption and no reads yet, the explorer offers Generate Reads: choose how many months back (1–24), then build 20-minute history from the start of that first month through the latest completed interval today. Off-taker sites spread estimated monthly demand by TOU; generator sites shape export (ex_*) energy from installed capacity and technology (solar little at night, wind, BESS evening dispatch, hydro, hybrid, coal baseload, gas morning and evening peak) — same empty-state UI on both directories. Overlay SIM meters such as MTR-NERSA-SIM-GEN-12 (coal) use those same shapes.

Follow along. Seat: Off-taker C (offtaker_c@webill.net). Path: OffTaker Sites → OffTaker C Midrand DC → Operations (the directory Meter action opens the same page). On the Consumption tab, the June 2026 bar sits in the high-season band and totals 1,168,000 kWh — peak 205,333 + standard 481,600 + off-peak 481,067 (Σ ✓; the cold-storage profile scales to the site’s 1,200,000 kWh/month estimate). Drill into any June day and the 20-minute bars appear with the weekday next to the date.

Data. full_demo · seed 42 · stage S05 (meter history: 12 months, 20-min cadence, 191,013 readings platform-wide) · sealed 2026-07-15 · re-derived from the monthly roll-up on 2026-07-18.

7.3 Seeing a gap

The demo dataset ships one deliberate gap so you can see what incomplete looks like without breaking any settlement story: the gallery device CODEX-DEMO-GALLERY-MISSING-READ is missing exactly one hour’s reads (three 20-minute slots, fourteen days before the history window’s end). On its Reads tab that hour is a red cell, Gaps in window shows 3, and Days w/ gaps shows 1. Every settlement-source meter in the demo set is complete — the gap lives only in the gallery.

Where this is taught. How settlement consumes intervals (and what a provisional hour means when data is late): V8 §3. How the demo history is generated and sealed: V21 · Operations §4 · §6.

7.6 Quality, vintage and revisions

ACTUAL is a meter value. ESTIMATED, SUBSTITUTED and INTERPOLATED record how a replacement was obtained. PROVISIONAL is first-received data; VERIFIED requires reconciliation evidence; REVISED records a correction. The original row remains in history, stamped as superseded. Current readers and continuous aggregates exclude it. Operations shows quality and vintage counts separately from gap coverage. A complete month may contain estimated or provisional rows; Consumption shows estimated energy contributions and each raw interval’s quality and vintage.

A FINAL settlement supplies a verification watermark for its meter. Legacy intervals after that watermark, or on devices without FINAL evidence, remain provisional. Unknown legacy feed provenance stays unknown.

7.7 Importing interval files

Demo history is already planted (stage S05). Import intervals is for when a person brings a file of 20-minute energy the meters did not tick in live — a utility export, a gap you filled from another system, or a first load before comms exist. It is a MANUAL feed (meter:import:canonical). Nothing is “late” until you press the button.

Think of a bank paying-in slip. The bank prints the columns. You fill every required box. If one line is wrong they hand the whole envelope back — they do not guess a missing meter or invent a missing 20 minutes. That all-or-nothing rule is atomic import.

When you would use it, and why

Use it when the energy must enter the same interval store settlement and the consumption explorer already read — and you hold that energy as a file, not as a live meter stream.

Situation Why a file, not a live tick Typical seat
A site is new and comms are not in yet You still need charts and a first settlement month Off-taker or IPP directory
The utility sent a CSV of last month Their file is the legal meter record for those hours Off-taker (import kWh) or IPP (export kWh)
You corrected a gap from another historian The Reads heatmap showed a hole; you now have the missing buckets Same site as the gap
You are rehearsing an upload in demo Mock canonical fixture speaks the same schema without a vendor Either directory

Do not use it to replace plant “now” telemetry (V4 §11) or carbon inverter readings. Those are other pipes. Do not use it to change TOU labels — Webill classifies peak / standard / off-peak from the timestamp (§8).

Where this is taught. The register of import feeds (canonical, mock, and the two utility dialects that are not on this form yet) is V21 §11. Quality and vintage words are §7.6.

Words you need

Plain English Platform word Meaning here
The house template for a file wb-interval-1 The published schema. JSON or CSV. No extra columns
The translator you pick File adapter canonical (real file) or mock (same shape, practice)
Who the row is about meter_ref Must equal a device number your organisation already owns
The start of the 20-minute bucket interval_start ISO-8601 with a UTC offset (+02:00 or Z). Not a local clock without a zone
How long the bucket is interval_minutes Must be 20 on this feed. 15 / 30 / 60 exist in the schema but refuse here
Energy drawn from the grid / site kwh_import Required on an off-taker (demand) upload
Energy sent out by the plant kwh_export Required on an IPP (supply) upload; off-taker files may omit it
How the figure was obtained quality ACTUAL, ESTIMATED, SUBSTITUTED, or INTERPOLATED — mandatory
How sure we are vintage PROVISIONAL (default), VERIFIED, or REVISED
Your own row id source_ref Optional. Kept on the feed attempt so you can match the utility’s line
All or nothing Atomic One bad row refuses the file. Nothing is written

CSV is a spreadsheet saved as text (comma-separated values). JSON is the same facts wrapped in { … }. kWh is kilowatt-hours. kvarh is reactive energy — allowed on the schema, optional. TOU is time-of-use (peak / standard / off-peak).

Where to click

Both directories use the same control. Import intervals (#open-interval-import) sits in the directory header, on the right beside the round + (Add New Site); the title and its one-line description are on the left. Press it and #interval-import-modal opens. There is no hanging drawer at the top of the page. The only difference after upload: OffTaker stores kwh_import; IPP stores kwh_export.

Follow along. Seat: offtaker_c@webill.net (Organization; password supersecret). Path: OffTaker Sites → press Import intervals (#open-interval-import) next to Add New Site. You should see: #interval-import-modal with a branded header and the line Upload metered readings as CSV or JSON. Each row needs a start time with its UTC offset, the interval length and a reading quality. A file with an unknown column is refused whole, so nothing half-imports. Then File adapter (Canonical CSV / JSON, or Mock canonical fixture), a file picker (.csv or .json, 5 MB), Validate file — disabled, with Choose a file to validate. under it — and Published interval schema (opens in a new tab).

On an IPP seat the click path is the same, and it works from either tab: open IPP Sites, press Import intervals (#open-interval-import) in the header on Fleet or Sites, and #interval-import-modal opens. The Fleet tab’s chapter 04 row Import intervals (#fleet-next-evidence, V4 §2.5) and a site workspace’s Operations tab (Meter history & interval coverage) open the same modal. After upload the platform stores kwh_export, not kwh_import.

Control What it does
File adapter canonical reads your bytes. mock is the same parser — pick it when the file is a practice fixture, not a live utility drop
File picker One file. .csv or .json only
Validate file Disabled until a file is chosen, with the hint Choose a file to validate. Then: parse → validate every row → check every meter is yours → preview direction and energy totals. No readings are saved until Import N intervals. It reads Validating… while it works
Published interval schema (opens in a new tab) (#interval-import-schema) Opens GET /api/v1/publication/interval-schema — the machine copy of the tables below — in a new browser tab, so the modal stays open
Verdict (#interval-import-verdict) A coloured box under the button. Green on success: Imported N intervals. G gaps reported; no gaps were filled. Rose on a refusal, announced to screen readers as an alert: File refused; nothing was imported. {reason} Fix the file and import it again. (§7.7.7)

The canonical schemas

The published id is wb-interval-1. Extra columns are not “ignored” — they refuse the file. The feed key on a JSON envelope must be exactly meter:import:canonical when the adapter is Canonical (or meter:import:mock when you picked Mock).

JSON envelope

Field Required What to put
schema yes the string wb-interval-1
feed_key yes meter:import:canonical (or meter:import:mock)
intervals yes an array of row objects. No other top-level keys

Each interval row

Column Required Rules
meter_ref yes Device number on a meter this organisation owns
interval_start yes Interval start. Must include an offset (2026-06-12T06:00:00+02:00 or …Z). A time without a zone is a naive timestamp and refuses the file
interval_minutes yes Integer. Allowed in the schema: 15, 20, 30, 60. This feed’s grain is 20 — any other value is grain_mismatch
kwh_import yes (demand) Decimal string or number, not negative, at most three digits after the point (12.345)
kwh_export yes on IPP uploads Same decimal rule. Off-taker files may leave it empty
kvarh_import / kvarh_export no Same decimal rule if present
quality yes ACTUAL · ESTIMATED · SUBSTITUTED · INTERPOLATED
vintage no PROVISIONAL (used if omitted) · VERIFIED · REVISED
source_ref no Your line id. Stored on the feed attempt

CSV is the same columns as a header row, then one data row per interval. No schema / feed_key wrapper. A UTF-8 BOM is tolerated. Quoted commas and Windows line endings are fine. Duplicate header names or a short/long data row refuse the file.

There is no TOU column. If you add tou or peak_kwh, the file is refused (unmapped_columns). Webill puts the energy into peak, standard, or off-peak from interval_start.

A sample upload

OffTaker C Midrand DC, meter MTR-OTS-thin_offtaker_c_private, two consecutive 20-minute buckets on Friday 12 June 2026 (high season). Energy is estimated from a utility extract, still provisional.

JSON (Canonical adapter):

{
  "schema": "wb-interval-1",
  "feed_key": "meter:import:canonical",
  "intervals": [
    {
      "meter_ref": "MTR-OTS-thin_offtaker_c_private",
      "interval_start": "2026-06-12T06:00:00+02:00",
      "interval_minutes": 20,
      "kwh_import": "18.250",
      "quality": "ESTIMATED",
      "vintage": "PROVISIONAL",
      "source_ref": "utility-row-0600"
    },
    {
      "meter_ref": "MTR-OTS-thin_offtaker_c_private",
      "interval_start": "2026-06-12T06:20:00+02:00",
      "interval_minutes": 20,
      "kwh_import": "17.800",
      "quality": "ESTIMATED",
      "vintage": "PROVISIONAL",
      "source_ref": "utility-row-0620"
    }
  ]
}

The same facts as CSV:

meter_ref,interval_start,interval_minutes,kwh_import,quality,vintage,source_ref
MTR-OTS-thin_offtaker_c_private,2026-06-12T06:00:00+02:00,20,18.250,ESTIMATED,PROVISIONAL,utility-row-0600
MTR-OTS-thin_offtaker_c_private,2026-06-12T06:20:00+02:00,20,17.800,ESTIMATED,PROVISIONAL,utility-row-0620

An IPP file looks the same except the energy column you care about is kwh_export, and you open the same modal on IPP Sites.

Data. Teaching clip — not a sealed S05 checksum. Device number is the frozen OffTaker C Midrand DC meter. Grain and feed key match meter:import:canonical. Last checked 2026-09-08.

What happens once the file is uploaded

flowchart TB
  A[You choose adapter and file, press Validate file] --> B{Parse CSV or JSON}
  B -->|bad envelope or columns| R[Refuse. Write nothing]
  B -->|rows parsed| C[Validate every row against wb-interval-1 and 20-minute grain]
  C -->|any row fails| R
  C -->|all rows ok| D{Every meter_ref is a device this organisation owns?}
  D -->|unknown or another org| R
  D -->|all yours| P[Check stored conflicts and preview dates, quality and totals]
  P --> Q[You confirm Import N intervals]
  Q --> E[One database transaction]
  E --> F[Each row: pick kwh_import or kwh_export]
  F --> G[Webill classifies TOU from interval_start]
  G --> H[Write one interval: only that TOU bucket holds the kWh]
  H --> I[Record OK on meter:import:canonical with file SHA-256 and source_ref]
  I --> J[Verdict: Imported N. G gaps reported; none filled]
  1. Parse. JSON must be exactly { schema, feed_key, intervals }. CSV must have a unique header and even rows.
  2. Validate. Unknown columns, missing required fields, naive times, negative energy, more than three decimal places, a quality/vintage you invented, mixed or wrong grain, or the same meter+start twice (duplicate_interval) — the whole file is refused.
  3. Ownership. meter_ref is looked up as device_number on your organisation. One foreign meter refuses every row, including the good ones.
  4. Preview and confirm. Review meter, demand/import or supply/export direction, interval count, cadence, energy totals and gaps, first/last timestamps in SAST and UTC, quality/vintage counts and sample rows. Any already-recorded timestamp refuses the whole file before confirmation. No readings are saved yet. Confirm Import N intervals, or replace the file. A site workspace accepts only that site’s meter; the downloaded template fills it in.
  5. Write (all or none). Stored timestamps are checked again. Imports add new intervals; they never overwrite existing readings, including superseded originals. Ask the meter data operator to correct stored evidence. For an off-taker, kwh_import is stored. For an IPP, kwh_export must be present. The platform asks the tariff calendar which TOU bucket that start falls in, then writes one interval: peak or standard or off-peak holds the kWh; the other two are zero. Quality, vintage, and the import feed id travel with the row.
  6. Evidence. The feed attempt keeps the file’s SHA-256 hash and each row’s source_ref for ninety days (and the latest attempt always). A refusal is recorded as REFUSED with the reason — still nothing in the interval store.
  7. Gaps. If your file jumps from 06:00 to 06:40, the verdict reports a gap. Webill does not invent 06:20. The Reads heatmap will show that hole until you import it.
  8. What you see next. Open the explorer (§7.2). The new buckets appear on the day drill. Estimation-limit checks refresh for those meters. Settlement reads the same interval table (V8 §3).

Done looks like: the green verdict names how many intervals were imported; gaps (if any) are counted, not filled; the consumption explorer shows those hours; /ops/feeds shows meter:import:canonical with a fresh last-success (when you are on a demo build).

What refuses the file

A refusal is the rose box File refused; nothing was imported. {reason} Fix the file and import it again. The reason is in plain words. When a row is at fault it starts with the row number — Row 3: the start time has no UTC offset (add +02:00). — and when several rows fail, the first one is named and the rest are counted: (2 more rows with problems).

You did this The reason you see What to fix
No file chosen Nothing — Validate file stays disabled, with Choose a file to validate. Pick a file
Extra column (tou, notes, …) unknown column tou. (or unknown columns tou, notes.) Delete it. TOU is classified here
JSON feed_key is not this adapter’s key the JSON file names a different feed. Use meter:import:canonical (or mock)
Time like 2026-06-12T06:00:00 (no zone) the start time has no UTC offset (add +02:00). Add +02:00 or Z
interval_minutes is 15 or 30 the interval length must be 20 minutes for this import feed. Request a 20-minute export from the provider; 30/60-minute readings are not automatically converted
meter_ref not on your org a meter number is not registered to this organisation. Use the device number from the site’s meter
IPP file with empty kwh_export a supply row has no exported energy. Fill export kWh
Two rows, same meter and start the same meter and start time appear twice. Keep one
A required value left empty a required value is empty. Fill it
Negative energy, or more than three decimals an energy value is negative. · an energy value is not a number (up to 3 decimals). Correct the figure
A quality or vintage you invented the reading quality is not a known value. · the reading vintage is not a known value. Use the words in §7.7.4
An empty file, or a quote never closed the file is empty. · a quoted value is never closed. Re-export the file
Any single row error Nothing imported Fix that row and send the file again

Live ticks and setup backfill use other feeds (meter:device_ingest, meter:setup_backfill, meter:live_simulator). They are not this modal. Attribution rules for those writers (manifest hashes, S15) stay with V21 §6.

Utility dialects — not on the form yet

Two more adapters exist in code: Eskom MV90 (eskom_mv90) and Municipal AMI (municipal_ami). They map a utility’s column names and a SAST clock onto wb-interval-1. They are not in the File adapter list until operations enables them after agreeing the exact export. A vendor’s product name on a file is not enough.

Adapter Typical columns Clock rule
Eskom MV90 Meter, IntervalEnd, Minutes, ImportKWh, … SAST interval end → UTC interval start
Municipal AMI meter_number, local_start, minutes, import_kwh, … SAST interval start

Until they are enabled, pick Canonical and convert the export yourself, or ask operations to turn the dialect on.

8. Tariffs and reference data

Two kinds of priced facts underpin every bill, statement and strategy number: tariffs (what energy costs a consumer) and Eskom’s network reference tables (what the wires cost, and how much energy the wires lose). Org users mostly read these; they are maintained in the Eskom and Munix apps (V8).

8.1 The anatomy of a tariff

A tariff belongs to Eskom or to one municipality, and is built from:

Worked example — a seeded municipal tariff. City of Johannesburg CODEX TOU has two charges: JHB municipal energy (KWH / MONTH) and JHB municipal service (ACCOUNT / MONTH). Its rates: energy HIGH·PEAK 313.45 c/kWh (Active), LOW·OFF 119.20 (Pending), HIGH·STANDARD 206.10 (Inactive); service 986.00 R (Active). One tariff, four priced cells, three lifecycle states — exactly what the tariff screens show. The six Eskom tariff shells (Megaflex, Miniflex, Ruraflex, Nightsave Urban Large, Nightsave Rural, Businessrate 1) are seeded the same way; off-taker sites in the demo reference Megaflex.

8.2 Which hour is peak? The TOU clock

Interval data is classified on the SAST calendar (no daylight saving): high season = June–August. Weekday peak windows shift with season; Saturdays have a morning standard band and no peak; Sundays are entirely off-peak. This clock is what splits every interval, chart bar and settlement total into peak / standard / off-peak (WB.Tariff.TouClassifier).

Eskom Megaflex TOU by hour (SAST · hours 0–23)
Peak Standard Off-peak
High-season weekday · Jun–Aug 012345 6 789 1011121314151617 1819 2021 2223
Low-season weekday · Sep–May 012345 678 910111213141516 1718 192021 2223
Saturday · both seasons 01234567 891011 121314151617181920212223
Sunday · both seasons 01234567891011121314151617181920212223

Read it: each cell is one SAST hour. High-season weekday peak is 07:00–09:59 and 18:00–19:59; low-season weekday peak is 06:00–08:59 and 17:00–18:59. Saturday standard is 08:00–11:59 only; Sunday never leaves off-peak.

8.3 The Eskom reference tables

Three effective-dated lookup tables — the physics-and-wires facts of chapter V0 §1 — browsable under Eskom app → Loss Factors (V19 §1):

Transmission loss factors (TLF) — keyed by customer type. Generators are keyed by zone alone: Cape 0.9710, Karoo 0.9950, Kwazulu-Natal 1.0040, Mpumalanga 1.0210, Vaal 1.0200, Waterberg 1.0230. Loads are keyed by zone + distance band: Zone 0 (≤300 km) 1.0112, Zone 1 1.0213, Zone 2 1.0316, Zone 3 (>900 km) 1.0419. The seeded vintage is effective 2026-03-01 → 2027-03-01.

Distribution loss factors (DLF) — keyed by voltage tier × urban/rural: <500V urban 1.1111, rural 1.1527; ≥500V–<66kV urban 1.0957, rural 1.1412; 66–132kV urban 1.0611; >132kV urban 1.0000. (The lower the voltage, the more the wires lose.)

Use-of-System charges (UoS) — keyed by charge category (DUoS load urban/rural, TUoS gen, DUoS gen), optionally narrowed by voltage tier or transmission zone: capacity and demand charges (R/kVA), an ancillary c/kWh, and the wheeling admin fee — e.g. DUoS Load Urban <500V: capacity R 34.79, demand R 65.96, ancillary 0.80 c/kWh, admin R 180.00/day for connections above 1 MVA.

A worked lookup. Settling a June 2026 interval for a generator in the Cape zone: TLF(generator, Cape, 2026-06-15) → the row effective 2026-03-01 → 0.9710 — injected energy is scaled by it before anything is priced. The same date for a Zone 0 load within 300 km → 1.0112. Effective dating means next year’s NERSA determination is loaded as new rows starting 2027-03-01; history keeps settling against the old ones.

Where this is taught. How these factors and charges enter a settlement line by line: V8 §4. Maintaining the tables and pricing rates: V21 · Operations (planned, M7).

Data. full_demo · seed 42 · stages S01/S02 (tariffs & reference: 10 TLF, 8 DLF, 7 UoS rows from the NERSA CSVs) · sealed 2026-07-15 · values re-derived from the database on 2026-07-18.

8.4 Fuel prices

The Eskom app’s Fuel prices register holds a fuel, an effective date window, a price in R/GJ, and the source behind it. A missing fuel is not priced at zero. The plant’s heat rate converts this price to fuel cost per MWh; the dispatch card adds variable operations and the estimated carbon assessment. See the operator procedure before replacing a reference row.

9. Municipalities

A municipality is the platform’s model of a local distributor: its name, province, boundary polygon (which is how the map pin resolves your site’s municipality), and — the fact everything turns on — its wheeling status:

Status Meaning On the maps
WHEELING wheeling-enabled — sites here can buy wheeled energy; the municipality can be accredited with (§2.3) green
PARTIAL partially enabled light green
PILOT pilot programme orange
NONE not enabled red

The full South African municipal register is imported from the national dataset; each demo municipality of interest (Johannesburg, Cape Town, Tshwane, eThekwini, Buffalo City, Mangaung, and the smaller Stellenbosch and George) carries its real boundary and province.

Where municipalities touch your work as an org user:

The municipality’s own side — its profile, wheeling participation and tariffs — is maintained by the municipal officer in the Munix app, taught in V21 · Operations §2.

10. Worked example — standing up the cast

This is part 1 of the thread (V0 §4): the entities every later volume’s examples run on. All of it exists ready-made in the demo dataset — follow along by inspecting; recreate any piece by walking the wizards of §§3–5 with the values below.

Data. full_demo · seed 42 · stages S01–S05 · sealed 2026-07-15 · M8 gate re-check 2026-07-18 · commit 925037a.

10.1 The thread’s two story lines

The cast — one direct deal, one trader chain (frozen names; see STYLE.md §8)
IPP2 Atlantis WindIPP 2 · Wind 80/70 MW · Cape Town (municipal) · meter MTR-NERSA-GEN-1002
→direct PPA
OffTaker C Midrand DCOffTaker C · Cold Storage · Johannesburg (municipal) · 22kV · meter MTR-OTS-…c_private
IPP3 Midrand HybridIPP 3 · Hybrid 45/38 MW · Johannesburg (Eskom, 132kV) · meter MTR-NERSA-GEN-1003
→sells to
T1 Renewables PoolTrader 1 · Both networks · Trader-Borne · Full Pass-Through
→resells to
OffTaker A Rosebank MallOffTaker A · Retail · Johannesburg (municipal) · 11kV · public

The direct line — IPP 2’s IPP2 Atlantis Wind sells straight to OffTaker C’s Midrand DC: one seller, one buyer, municipal wheeling. The chain line — IPP 3’s Midrand Hybrid (Eskom-connected) sells to Trader 1’s T1 Renewables Pool, which resells to OffTaker A’s Rosebank Mall (and lays off a slice to Trader 2’s T2 Flex Pool — the trader-to-trader leg). Both lines already carry ACTIVE contracts in the demo; V1 shows how they were made.

10.2 Standing up the buyer (Off-taker C’s playbook)

  1. Configuration (§2): profile complete; Eskom accreditation signed (OffTaker C is one of the fully-accredited seats).
  2. OffTaker Sites → Add New Site (V5 §2.3; demand-class write-down §3.2): OffTaker C Midrand DC — Municipality connection resolved by dropping the pin in Midrand (Johannesburg, WHEELING); Cold Storage (create writes Industrial + Municipal); 22kV; enter meter MTR-OTS-thin_offtaker_c_private as a new device; tariff City of Johannesburg CODEX TOU; demand 1,200,000 kWh/month ≈ 14,400 MWh/yr; requested 12,000 MWh/yr (the ~85 % rule); 10-year horizon, Fixed preference, REC on.
  3. Verify data is flowing (§7.2): the consumption explorer shows twelve months of history — June 2026 totals 1,168,000 kWh.

10.3 Standing up the seller (IPP 2’s playbook)

  1. Configuration: complete, accredited (Eskom + JHB + CPT).
  2. IPP Sites → Add New Site (the round +, a blank onboarding form — §4.3; field reference §4.2): IPP2 Atlantis Wind — project stage Operational; pin in Atlantis (City of Cape Town), Municipality connection; Wind; installed 80 MWp, export 70 MW, inverter 75 MVA; CF 38 % → P50 232,960 MWh; TOU split 20/45/35; transformer 11kV/66kV · 5 MVA · Dyn11 · 6.5 % · ONAF; COD 2024-09-01, 25-year life; meter MTR-NERSA-GEN-1002; Schedule 2 not exempt — NERSA license NERSA-GEN-1002 (2023-03-01 → 2043-03-01).
  3. The site lists Active, public, with its wind pill — and appears in buyers’ market searches from that moment.

10.4 Standing up the trader (Trader 1’s playbook)

  1. Configuration: Eskom TPA and BSA signed; municipal accreditations for Johannesburg and Cape Town — without these, §5.1’s amber notice blocks pool creation.
  2. Trader Pools → Add New Pool (§5.3): T1 Renewables Pool — Active, public; Both networks; Buy / Sell / Wheel Energy; nomination-capable; Trader-Borne balancing; Full Pass-Through wheeling charges; the default protection set plus Price Caps and Dispute Resolution.

10.5 You are ready to deal when…

Previously in the thread → V0 §4 · Lifecycle spine. Next in the thread → V7 §7 · the physical deal (and V7 §8 · the virtual deal). Later for these entities: strategy books in V3, the IPP programme in V4.

11. Plant feeds

A plant feed identifies a generator site, delivery path, cadence and effective period. Its signal list is derived from the site’s technology: solar irradiance and temperature, wind speed/direction and available units, or battery charge/health/temperature. A battery feed binds the site’s battery asset. The feed also has an entry in the operational feed registry.

11.1 Delivery and responsibility

The plant owns its collector. The platform hosts a push endpoint and an operator-configured file inbox; it does not install plant software or issue plant controls. Register Push API, Mirror file, or Mock on the owner’s plant screen. Choose five- or ten-minute cadence and the start date. The default freshness allowance is three cadences. Signed pushes can be required per feed.

The standard draft data schedule lists schema, path, cadence, latency, signals, collector responsibility, consent scope and forecast fallback. Download it for contract preparation. The stored artifact is a hashed draft, and signing remains a separate commercial act.

11.2 Historian mirror CSV

Download the feed-specific template and schema. The first line must be exactly:

# schema=telemetry.mirror.v1 feed=<plant-feed-uuid> tz=+02:00

Keep the template’s named columns; their order may change and quality may be omitted. Quote CSV values containing commas or newlines. Empty cells mean absent values; alarms are separated by semicolons. Use decimal strings, kW for power and percent for charge and setpoint. Every timestamp needs an explicit offset, for example 2026-08-18T11:00:00+02:00. A ten-minute feed uses six buckets per hour.

Deliver files into the feed’s directory in the operator’s configured inbox. The sweep archives accepted files under processed/, refusals under rejected/, with a .reason sidecar. A partially valid file reports rejected row indexes. The original bytes are retained as an artifact. Repeating identical normalised content returns the original batch; changed buckets receive a new revision.

Consent is effective-dated and names the grantee organisation. LIVE_PANEL, SAMPLES and EVIDENCE are cumulative read scopes; the owner’s registration remains responsible for pushes. Battery health does not appear in LIVE_PANEL. No grant means the other organisation sees no feed.

Huawei FusionSolar, Sungrow iSolarCloud, SMA ennexOS and SolarEdge are reserved provider values. Their live adapters and pull jobs are not opened. Opening a cloud path needs a signed data schedule naming it, the customer’s vendor account and an approved egress destination. Commercial provider rows require a credential reference and cannot be activated while the trigger is unmet. Development, test and production defaults resolve the Mock with network access forbidden.